Prabowo, Rendy Septiadi (2015) Analisa Manfaat Biaya Pembangunan Proyek Waduk Konto Wiu Di Desa Wiyurejo Kecamatan Pujon Kabupaten Malang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
3109100069-Undergraduate-Theses.pdf - Published Version Download (1MB) | Preview |
Abstract
Daerah Irigasi Siman yang terletak di daerah kabupaten Kediri dan Jombang
serta sebagian kecil di Kabupaten Malang memperoleh pasokan air yang berasal dari
Bendungan. Keberadaan waduk di Bendungan Selorejo belum dapat mencukupi kebutuhan
Daerah Irigasi Siman yang mempunyai luas areal sebesar 23.578 ha. Diperlukan adanya
tambahan supply air dengan cara dibangunnya waduk suplesi baru, salah satunya Waduk
Konto Wiu di Desa Wiyurejo, Kecamatan Pujon. Pembangunan Waduk merupakan proyek
pemerintah dengan anggaran yang besar, maka perlu ditinjau dari segi manfaat yang
diperlukan dengan biaya yang dikeluarkan. Tugas akhir ini bertujuan untuk menganalisa
antara manfaat yang diterima oleh masyarakat dengan biaya yang dikeluarkan oleh
pemerintah dalam pembangunan proyek Waduk Konto Wiu.
Metode yang dilakukan adalah dengan menggunakan analisa manfaat biaya
dengan perhitungan Benefit Cost Ratio. Manfaat yang diperhitungkan yaitu manfaat yang
berupa hasil peningkatan produksi hasil panen pertanian setelah beroperasinya waduk.
Biaya yang diperhitungkan terdiri dari biaya investasi pembangunan waduk serta biaya
operasional dan perawatan yang harus dikeluarkan. Hasil akhir dari penelitian tugas akhir
ini mengetahui kelayakan proyek pembangunan Waduk Konto Wiu berdasarkan analisa
manfaat biaya.
Dari hasil analisa yang telah dilakukan, maka dapat disimpulkan bahwa rasio
kelayakan perhitungan BCR bernilai lebih dari satu maka pembangunan proyek Waduk
Konto Wiu layak dibangun oleh Pemerintah untuk masyarakat Wiyurejo.
=================================================================
Siman Irrigation Area which is located in the district of Kediri and Jombang
as well as a small portion in Malang obtain a supply of water from the Dam. Selorejo Dam
reservoir in existence has not been able to fulfil the needs Siman Irrigation Area which has
a total area of 23.578 ha. Any additional supply of water by the construction of new
suppletion reservoirs, one reservoir Konto Wiu in the village Wiyurejo, Pujon. Reservoir
development is a project of the government with a large budget, it is necessary in terms of
revenue necessary benefits to the costs incurred. This final projects aims to analyze the
benefits received by the public people with the costs incurred by the government in the
construction of dam projects Konto Wiu.
The method is by using cost benefit analysis with the calculation of Benefit
Cost Ratio. The benefits are taken into account the benefits that the form of the increased
intensity of cropping agricultural harvest after the operation of the reservoir. The costs
consist of the investment costs accounted for the construction of reservoirs as well as
operational and maintenance costs to be incurred. The final results of the study determine
the feasibility of dam construction project Konto Wiu based on cost benefit analysis.
From the analysis that has been done, it can be concluded result that the
ratio of BCR eligibility calculation is worth more than one, then the project worthy for Konto
Wiu dam built by the Government for public Wiyurejo.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSS 627.86 Pra a |
Uncontrolled Keywords: | Analisa Manfaat Biaya, Benefit Cost Ratio, Waduk, Cost Benefit Analysis, Benefit Cost Ratio, Dam |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Anis Wulandari |
Date Deposited: | 21 Aug 2017 07:58 |
Last Modified: | 21 Aug 2017 07:58 |
URI: | http://repository.its.ac.id/id/eprint/48689 |
Actions (login required)
View Item |