Mimbar, Donny Yusuf (2016) Estimasi Biaya Fabrikasi Platform (Studi Kasus Di Pt. Pal Surabaya Project Madura-Bd). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
4310100071-Undergraduate Thesis.pdf - Published Version Download (2MB) | Preview |
Abstract
Dalam proses pembangunan jacket platform banyak faktor yang mempengaruhinya meliputi
waktu atau penjadualan, peralatan yang dibutuhkan, sumber daya manusia atau jam orang
(manhours) dan biaya. Semua faktor yang diatas harus terkendali agar penyelesaian proyek
tepat waktu dan mempunyai kualitas yang baik agar biaya tidak membengkak. Keakurasian
pengestimasian biaya merupakan hal yang paling utama dikarenakan jika keakurasian dan
pengestimasian biaya tidak akurat maka peluang kegagalan atau kerugian semakin besar.
Oleh sebab itu dibutuhkan manajemen dalam pembuatan schedule serta kurva S untuk
mengontrol proyek pembangunan platform dan juga penganggaran biaya pengerjaan proyek
pembangunan platform. Tugas Akhir ini bertujuan untuk mengetahui bagaimana proses
fabrikasi platform dan menghitung biaya serta waktu yang dibutuhkan untuk proses
fabrikasi platform ini. Dari hasil analisa maka didapatkan bahwa total biaya fabrikasi
platform Madura BD adalah sebesar $ 6,991,958.64 atau sekitar Rp 90.895.462.320,00 dan
membutuhkan waktu selama 533 hari atau sekitar 17 bulan 23 hari.
===============================================================================================
In the process of the construction of the platform jacket many influencing factors include the
time or scheduling, required equipment, human resources or manhours and costs. All the
above factors must be controlled so that the completion of projects on time and have a good
quality so that the cost does not swell. The accuracy of estimating the cost is the most
important thing because if the accuracy and cost estimation is not accurate then the
probability of failure or loss even greater. Therefore, management is required in the
manufacture of a schedule as well as the S curve to control the construction of the platform
and also budgeting project development platform. This final project aims to determine how
the fabrication process platform and calculate the cost and time required for the fabrication
process of this platform. From the analysis it was found that the total cost of fabricating the
Madura BD platform is $ 6,991,958.64 or approximately Rp 90,895,462,320.00 and takes as
long as 533 days, or about 17 months of 23 days
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSKe 627.98 Mim e |
Uncontrolled Keywords: | jacket platform, biaya, kurva S, schedule, fabrication cost, manhours |
Subjects: | T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures |
Divisions: | Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis |
Depositing User: | Mr. Tondo Indra Nyata |
Date Deposited: | 30 Aug 2017 07:20 |
Last Modified: | 27 Dec 2018 02:58 |
URI: | http://repository.its.ac.id/id/eprint/48785 |
Actions (login required)
View Item |