Analisa Keterlambatan Pada Proyek Pembangunan Jacket Structure

Redana, Firza (2016) Analisa Keterlambatan Pada Proyek Pembangunan Jacket Structure. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4311100011-Undergraduate Thesis.pdf]
Preview
Text
4311100011-Undergraduate Thesis.pdf

Download (3MB) | Preview

Abstract

Proses pembangunan jacket structure tidak selalu sesuai dengan jadwal yang telah direncanakan sebelumnya. Banyak faktor yang mempengaruhi kegagalan perencanaan, antara lain waktu atau jadwal yang direncanakan, biaya yang dianggarkan, peralatan dan material yang diperlukan, sumber daya manusia (man power) dan jam pekerja (man hours). Perlu adanya cara atau metode yang sistematis untuk mengatasi masalah keterlambatan proyek tersebut. Tugas akhir ini menganalisa faktor penyebab dan dampak keterlambatan pada proyek pembangunan jacket structure di PT. XYZ dengan menggunakan metode Fault Tree Analysis (FTA) dan Event Tree Analysis (ETA). Dari kedua analisa tersebut didapatkan diagram bow-tie yang berguna untuk menganalisa faktor apa saja yang bisa dicegah dengan membuat pencegahan pada proyek dan menganalisa dampak apa saja yang bisa dikurangi dengan membuat mitigasi proyek. Dari hasil analisa menggunakan metode fault tree analysis (FTA) didapatkan hasil total peluang kejadian top event pada keterlambatan proyek pembangunan jacket structure terjadi sebesar 0,1037. Untuk hasil analisa menggunakan metode event tree analysis (ETA) didapatkan hasil yaitu proyek pembangunan jacket structure selesai di fabrikasi namun mengalami keterlambatan antara 1 hari hingga 8 minggu (2 Bulan). Hal tersebut diakibatkan oleh beberapa faktor dan dikenai denda atau pinalti sebesar 0,1% perhari dari total nilai kontrak proyek pembangunan jacket structure sebesar Rp 64.620.178.000,-. Denda berkisar antara Rp 64.620.178,- hingga Rp 2.843.287.832,-. Hasil dari kedua analisa tersebut dikombinasikan ke dalam Bow-Tie Analysis dalam bentuk barrier untuk tindakan pencegahan ancaman dari hasil metode fault tree analysis (FTA) dan barrier untuk tindakan pemulihan atau pengurangan konsekuensi dari hasil event tree analysis (ETA) pada proyek pembangunan jacket structure.
===============================================================================================
Construction process of the jacket structure is not always in accordance with the planned schedule in advance. Many factors affect the planning failure, among others, the time or the planned schedule, budgeted costs, equipment and material needed, the human resources (manpower) and hours of labor (man hours). The need for a systematic manner or method to overcome the problem of delays in the project. This thesis to analyze the causes and effects of delay in jacket structure construction projects in PT. XYZ using the Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From both the analysis obtained bow-tie diagram useful for analyzing what factors can be prevented by making prevention on the project and analyze the impact of anything that can be reduced by making projects mitigation. From the analysis using fault tree analysis (FTA) showed total chance occurrence top event on the jacket structure construction project delays occur at 0,1037. For the analysis results using event tree analysis (ETA) showed that the construction project is completed in the fabrication of the jacket structure but experiencing delays between 1 day to 8 weeks (2 months). This is caused by several factors and are subject to a fine or a penalty of 0,1% per day of the total contract value of jacket structure construction projects that is Rp 64.620.178.000,-. Fines range between Rp 64.620.178,- to Rp 2.843.287.832,-. The results of both analyzes are combined into the Bow-Tie Analysis in the form of barrier to preventive measures the threat of the results of the method of fault tree analysis (FTA) and a barrier to recovery action or reduction of the consequences of the results of the event tree analysis (ETA) on jacket structure construction projects.

Item Type: Thesis (Undergraduate)
Additional Information: RSKe 658.404 Red a
Uncontrolled Keywords: Analisa Keterlambatan Fabrikasi, Fault Tree Analysis, Event Tree Analysis, Bow-Tie Analysis
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 08 Sep 2017 03:30
Last Modified: 27 Dec 2018 06:47
URI: http://repository.its.ac.id/id/eprint/48815

Actions (login required)

View Item View Item