Falah, Halida Azmi (2018) Analisis Pengaruh Flow Rate dan Pressure pada In Situ Well Repair Menggunakan Material Polyacrylamide dengan CFD-FEM Coupling Method. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
02511440000090-Undergraduate_Theses.pdf - Accepted Version Download (6MB) | Preview |
Abstract
Kebocoran pipa produksi (production tubing) dalam kegiatan eksplorasi minyak bumi dan gas alam dapat mengganggu proses produksi. Untuk itu, diperlukan metode yang tepat untuk memperbaiki kebocoran tubing tanpa menghentikan proses (shutdown). Salah satu metode perbaikan yang dapat digunakan adalah in situ well repair. In situ well repair dilakukan dengan penambalan (patching) menggunakan polimer superabsorbent jenis polyacrylamide pada flow rate dan tekanan tertentu. Pada penelitian ini dilakukan simulasi dengan CFD dan FEM untuk menganalisis pengaruh tekanan dan flow rate yang menghasilkan kemampuan in situ well repair paling optimum untuk mengatasi kebocoran tubing dengan menggunakan software ANSYS. Hasil yang diperoleh yaitu semakin besar flow rate dan tekanan, maka akan semakin besar pula kemungkinan terjadinya deformasi patch pada lokasi in situ well repair. Flow rate yang menghasilkan kemampuan in situ well repair paling optimum adalah 1000 bpd dengan nilai tekanan sebesar 36,82 Pa pada lokasi patch dengan jarak 180 inch dari dasar tubing.
=======================================================================================================
Leakage of production tubing in crude oil and natural gas
exploration activities may disrupt production processes.
Therefore, a proper method is needed to
repair
the tubing leakage
without shut the process down.
One of improvement method that
can be used is in situ well repair. In situ well repair is done by
patching using superabsorbent polymer, in this case is
polyacrylamide, at certain flow rate and pressure. In this research,
simulation using
CFD and FEM
is us
ed to analyse the effect of flow
rate and pressure that give the most optimum in situ well repair
capability to overcome tubing leakage using ANSYS software. The
results obtained are the greater flow rate and pressure, the greater
possibility of patch defo
rmation at the location of in situ well
repair.
Flow rate that produces the most optimum in situ well
repair capability is 1000 bpd with a pressure value of 36,82 Pa at
the patch site with a distance of 180 inches from the bottom of the
tubing
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSMt 620.106 4 Fal a-1 3100018074250 |
Uncontrolled Keywords: | In Situ Well Repair, Kebocoran Tubing, Patching, Polyacrylamide |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA347 Finite Element Method T Technology > TJ Mechanical engineering and machinery > TJ935 Pipe--Fluid dynamics. Tubes--Fluid dynamics |
Divisions: | Faculty of Industrial Technology > Material & Metallurgical Engineering > 28201-(S1) Undergraduate Thesis |
Depositing User: | Falah Halida Azmi |
Date Deposited: | 20 Feb 2018 02:09 |
Last Modified: | 29 Apr 2020 00:43 |
URI: | http://repository.its.ac.id/id/eprint/49300 |
Actions (login required)
View Item |