Analisis Risiko Keselamatan Dan Kesehatan Kerja Dengan Menggunakan Model Modified House Of Risk (Hor) Pada Instalasi Gawat Darurat (Igd) Rumah Sakit Umum Haji Surabaya

Malita, Agustin Nur (2018) Analisis Risiko Keselamatan Dan Kesehatan Kerja Dengan Menggunakan Model Modified House Of Risk (Hor) Pada Instalasi Gawat Darurat (Igd) Rumah Sakit Umum Haji Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 02411440000018_Undergraduate_Theses.pdf]
Preview
Text
02411440000018_Undergraduate_Theses.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Setiap Instalasi Gawat Darurat (IGD) di rumah sakit wajib memiliki pengelolaan risiko sesuai dengan Peraturan Menteri Kesehatan Republik Indonesia Nomor 66 Tahun 2016 dan Keputusan Menteri Kesehatan Republik Indonesia Nomor 856/Menkes/SK/IX/2009 tentang Standar Instalasi Gawat Darurat (IGD) Rumah Sakit. IGD RSU Haji Surabaya merupakan instalasi yang memiliki peningkatan jumlah kunjungan tiap tahunnya mulai dari tahun 2014 hingga tahun 2016. Hal ini membuat IGD menjadi salah satu bagian penting pada RSU Haji Surabaya yang membutuhkan pengelolaan risiko yang komprehensif untuk meningkatkan mutu pelayanannya.
Penelitian ini bertujuan untuk merancang tindakan mitigasi dari risiko Keselamatan dan Kesehatan Kerja (K3) di IGD RSU Haji Surabaya dengan menggunakan model modified House of Risk (HOR). Modifikasi dilakukan dengan mengubah proses bisnis Suppy Chain Order Referenc(SCOR) dengan Six Pathway Diagram dan reference model Software-Hardware-Environment-Liveware (SHELL). Terdapat 2 fase dalam HOR, fase 1 merupakan fase identifikasi dan penilaian kejadian risiko (risk event) dan agen risiko (risk agent). Sedangkan pada fase 2 adalah fase perancangan strategi mitigasi.
Berdasarkan hasil identifikasi, diperoleh 64 kejadian risiko (risk event), 70 agen risiko (risk agent). Mitigasi dirancang untuk 5 agen risiko yang menjadi prioritas penanganan. Terdapat 9 alternatif preventive action yang dirancang untuk menangani agen risiko. Dihasilkan 2 klaster strategi mitigasi yang dipilih untuk dijalankan yaitu pengembangan teknologi informasi dan komunikasi dan perbaikan tata letak ruang IGD dan pemasangan rambu-rambu.
======================================================================================
Each Emergency Installation (IGD) in a hospital must have risk management in accordance with Peraturan Menteri Kesehatan Republik Indonesia Nomor 66 Tahun 2016 and Keputusan Menteri Kesehatan Republik Indonesia Nomor 856/Menkes/SK/IX/2009 tentang Standar Instalasi Gawat Darurat (IGD) Rumah Sakit. IGD RSU Haji Surabaya is an installation that has an increasing number of visits each year starting from 2014 until 2016. This makes the IGD become one of the important parts of RSU Haji Surabaya which requires comprehensive risk management to improve the quality of service.
This study aims to design mitigation action from Occupational Safety and Health (K3) risk in IGD RSU Haji Surabaya by using modified House of Risk (HOR) model. The modification is done by changing the business process of Supply Chain Order Reference (SCOR) with Six Pathway Diagram and Reference Model of Software-Hardware-Environment-Liveware (SHELL). There are 2 phases in HOR, first phase is the phase of identification and assessment of risk events and risk agents. While in second phase is the design phase of mitigation strategy.
Based on the results of identification, obtained 64 risk events and 70 risk agents. Mitigation os designed for 5 priority risk agents. There are 9 preventive action alternatives designed to handle risk agents. Generated 2 clusters of mitigation strategies selected to be implemented are the development of information and communication technology and improvement of emergency room layout and installation of signs.

Item Type: Thesis (Undergraduate)
Additional Information: RSI 620.86 Mal a-1 3100018074346
Uncontrolled Keywords: HOR, K3, Mitigasi, Risk Agent, Risk Event
Subjects: T Technology > T Technology (General) > T55 Industrial Safety
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Agustin Nur Malita
Date Deposited: 27 Feb 2018 07:22
Last Modified: 18 May 2020 00:43
URI: http://repository.its.ac.id/id/eprint/49483

Actions (login required)

View Item View Item