Analisa Percepatan Waktu Instalasi Offshore Pipeline

Safri, M. Aldi (2018) Analisa Percepatan Waktu Instalasi Offshore Pipeline. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
Analisa Percepatan Waktu Instalasi Offshore Pipeline_Full.pdf - Published Version
Restricted to Repository staff only

Download (3MB) | Request a copy

Abstract

Pada suatu kegiatan proyek, faktor perencanaan menjadi salah satu faktor kritis yang dapat menentukan keberhasilan dari suatu proyek. Keterlambatan adalah suatu hal yang paling di hindari oleh perusahaan kontraktor sebagai pelaksana proyek. Sebagai suatu cara untuk mengantisipasinya maka diperlukan perancangan proyek dengan alternatif percepatan waktu proyek. Dalam proyek Instalasi Offshore Pipeline milik PT. X ini percepatan dilakukan dengan cara penambahan jumlah pekerja untuk kegiatan kantor dan penambahan metode instalasi lain pada proses instalasinya. Dengan penambahan metode instalasi, maka bertambah pula jumlah pekerja yang disertakan. Dari hasil analisa yang telah dilakukan, untuk Instalasi Normal satu sisi di dapatkan durasi waktu terpanjang dari jalur kritis yaitu 719 hari dengan total biaya $ 9.129.174 Dollar. Sedangkan setelah di percepat menggunakan metode instalasi dari dua sisi platform dan disambung dengan metode Above Water Tie-In, maka di dapatkan waktu tercepat 684 hari dengan total biaya sekitar $ 11.783.717 Dollar. Sehingga total kenaikkan biayanya adalah 23%. ======================================================== In the project activity, planning becomes one of critical factor that can determine the success of a project. Delays are the most avoided by the contractor companies as a project excecutor. As a way to anticipate its, the engineer needs a good project planning with acceleration time of project. In this offshore pipeline installation project that owned by PT. X, the acceleration time of project is done by adding the number of workers for office activities and using another method of offshore pipeline installation. Using this method also adding more workers and equipments. From the results of the analysis that has been done, for Normal Offshore Pipeline Installation one side the authors get the longest duration of time from critical path is 719 days with total cost $ 9,129,174 Dollar. While after the acceleration time of project using the installation method from two sides of the platform and connected with Above Water Tie-In method, the authors get the fastest time 684 days with a total cost about $ 11,783,717 Dollar. So the total cost increase 23%.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Percepatan Proyek, CPM, Pipeline, Above Water Tie-In.
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Marine Technology > Ocean Engineering > (S1) Undergraduate Theses
Depositing User: M. Aldi Safri
Date Deposited: 22 Jan 2018 06:02
Last Modified: 22 Jan 2018 06:04
URI: http://repository.its.ac.id/id/eprint/49946

Actions (login required)

View Item View Item