Analisis Pemilihan Sumber Daya Listrik Utama Untuk Kebutuhan Rumah Pompa Greges

., Yudiono (2018) Analisis Pemilihan Sumber Daya Listrik Utama Untuk Kebutuhan Rumah Pompa Greges. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3115207813-Master_Thesis.pdf]
Preview
Text
3115207813-Master_Thesis.pdf - Accepted Version

Download (11MB) | Preview

Abstract

Pemerintah pusat lewat Direktorat Pengembangan Penyehatan Lingkungan dan Pemukiman (PPLP) Ditjen Cipta Karya Kementerian Pekerjaan Umum dan Perumahan Rakyat turut serta berpartisipasi dalam rangka penyelenggaraan drainase kota Surabaya dengan cara memberikan bantuan pembangunan rumah pompa. Salah satu rumah pompa tersebut adalah Rumah Pompa Greges. Rumah pompa Greges sebagai salah satu rumah pompa yang berada di Surabaya, merupakan salah satu pengendali sistem drainase di sekitar wilayah Bozem Morokrembangan khususnya aliran air di sepanjang saluran Greges yang juga menjadi outlet bagi beberapa saluran. Dalam bantuannya rumah pompa tersebut memilih menggunakan Genset sebagai Sumber Daya Listrik (SDL) utama. Sementara Pemerintah Kota Surabaya selalu menginginkan penggunaan SDL dari PLN.
Tujuan penelitian ini untuk menganalisis pemakaian SDL untuk memenuhi kebutuhan Rumah Pompa Greges dengan melakukan analisa biaya yang dibutuhkan rumah pompa Greges untuk penggunaan sumber daya listrik genset dan PLN, menentukan prioritas kriteria yang digunakan dalam pemilihan penggunaan sumber daya listrik utama rumah pompa Greges dengan menggunakan metode Analitycal Hierarchy Procces (AHP) dan menentukan pilihan SDL yang lebih baik untuk digunakan untuk memenuhi kebutuhan rumah pompa Greges.
Berdasarkan analisa biaya operasional PLN lebih baik daripada genset. Berdasarkan analisa terhadap biaya, penggunaan genset lebih baik daripada PLN pada analisa biaya investasi. Pada periode tahun pertama biaya total untuk penggunaan PLN lebih besar daripada genset, pada periode tahun kedua biaya penggunaan PLN mendekati biaya genset, dan pada ketiga dan seterusnya penggunaan genset lebih tinggi daripada PLN. Berdasarkan analisa menggunakan metode AHP diketahui bahwa pembobotan berdasar kriteria biaya, kinerja pompa dan kenyamanan maka didapatkan pembobotan peringkat bahwa penggunaan genset adalah 0,2035 dan PLN adalah 0,7965. Dengan nilai CR < 0,1 yaitu 0,0562 maka tingkat inkonsistensi dapat diterima, sehingga hasil amalisis dapat diterima tidak perlu melakukan pengulangan.
=======================================================================================================
The central government through the Directorate of Environmental Sanitation Development (PPLP) of the Directorate General of Human Settlements of the Ministry of Public Works and Public Housing participated in the implementation of drainage of Surabaya city by providing assistance for the construction of pump houses. One of the pump houses is Pump House Greges. The pump house Greges as one of the pump house located in Surabaya, is one of the drainage system controllers around Bozem Morokrembangan area especially the flow of water along the Greges channel which is also an outlet for several channels. In the aid of the pump house choose to use Genset as the main power source (SDL). While the Surabaya City Government always wants the use of SDL from PLN.
The purpose of this study was to analyze the use of SDL to meet the needs of the Greges Pump House by performing the cost analysis required for the Greges pump house for the use of generator and PLN power sources, determining the priority criteria used in the selection of the main power source of the Greges pump house using the Analitycal Hierarchy Procces (AHP) and specify better SDL options to be used to meet the needs of the Greges pumping post.
Based on PLN operational cost analysis is better than generator. Based on the analysis of costs, the use of generators is better than PLN in the investment cost analysis. In the first year period the total cost for the use of PLN is greater than the generator, in the second year the cost of using PLN approaches the generator cost, and on the third and so the use of generator is higher than the PLN. Based on analysis using AHP method known that weighting based on cost criterion, pump performance and comfort hence got weighting rank that use of genset is 0,2035 and PLN is 0,7965. With CR <0,1 value is 0,0562 then inconsistency level can be accepted, so acceptable result of amalysis do not need to do repetition.

Item Type: Thesis (Masters)
Additional Information: RTS 628.144 Yud a-1 3100018074910
Uncontrolled Keywords: Rumah Pompa Greges; Pompa; Sumber Daya Listrik; Genset; PLN; Biaya; Pumping Post Greges; Pump; Electrical Power Supply; Genereator Set; Cost
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22101-(S2) Master Thesis
Depositing User: yudiono .
Date Deposited: 08 Mar 2018 08:35
Last Modified: 10 Jul 2020 04:44
URI: http://repository.its.ac.id/id/eprint/49968