Rancangan Ballast Water Treatment System (Bwts) Pada Kapal Gas Carrier Arimbi

Bendesa, I Putu Dewangga Putra (2018) Rancangan Ballast Water Treatment System (Bwts) Pada Kapal Gas Carrier Arimbi. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211240000118-Undergraduate-Theses.pdf]
Preview
Text
04211240000118-Undergraduate-Theses.pdf - Accepted Version

Download (1MB) | Preview

Abstract

Seiring dengan berkembangnya export impor di dunia, mengakibatkan permintaan akan penggunaan jasa transportasi kapal semakin meningkat. Transportasi laut merupakan cara distribusi komoditi yang paling efektif dan ekonomis. Dengan semakin meningkatnya kegiatan distribusi menggunakan kapal, maka pertukaran air balas kapal juga semakin meningkat, dan sayangnya penyebaran berbagai macam spesies invasi seperti bakteri, mikroba, telur, dan larva dari berbagai macam jenis kehidupan di lautan juga semakin meningkat. Karena itulah International Maritime Organization (IMO) secara resmi mengesahkan BWM Convention yang mulai diberlakukan pada September 2017. Karena itulah, dalam tugas akhir ini dilakukan perancangan Ballast Water Treatment System (BWTS) pada kapal Gas Carrier ARIMBI, untuk memenuhi aturan yang diresmikan oleh IMO. Setelah pemilihan dari berbagai macam metode treatment yang tersedia, BWTS yang digunakan untuk kapal ARIMBI adalah kombinasi treatment dari 3 jenis metode, yaitu Filtration, Ultraviolet Radiation, dan Photo-catalytic Oxidation. Metode ini terpilih karena memiliki 3 tahap dalam pembasmian mikroorganisme berbahaya dalam air balas, sehingga hanya membutuhkan 1 kali proses pembersihan dan lebih banyak menghemat banyak waktu dan tenaga. Setelah itu, untuk menunjang pengoperasian unit BWTS pada kapal gas carrier, maka perlu dilakukan perhitungan ulang untuk tekanan pompa untuk memastikan apakah pompa yang sudah terpasang memiliki kapasitas yang cukup untuk pengoperasian sistem tambahan BWTS. Pada perhitungan yang telah dilakukan, ditemukan tekanan pompa yang dibutuhkan adalah 16.62 m, dengan debit air yang masih sama dengan pompa sebelumnya yaitu 350 m3/jam. Karena tekanan pompa yang dibutuhkan masih jauh lebih kecil dari tekanan pompa yang sudah terpasang, maka tidak perlu dilakukan pergantian pompa untuk pengoperasian BWTS.

========================================================================================================

Along with the progressing of import - export in the world, resulting in increasing demand for the use of ship transportation services. Sea transportation is the most effective and economical way of distributing commodities. With the increase in ship distribution activities, the water exchange of vessels is also increasing, and unfortunately the spread of various invasive species such as bacteria, microbes, eggs and larvae from various types of life in the oceans is also increasing. That is why the International Maritime Organization (IMO) officially endorsed the BWM Convention which came into effect in September 2017. Therefore, in this final project, the design of Ballast Water Treatment System (BWTS) on the ARIMBI Gas Carrier vessel, to meet the rules inaugurated by IMO. After the selection of various treatment methods available, BWTS used for ARIMBI vessels is a combination of treatment from 3 types of methods, namely Filtration, Ultraviolet Radiation, and Photo-catalytic Oxidation. This method is chosen because it has 3 stages in eradicating harmful microorganisms in water ballast, so it only takes 1 cleaning process and save much more time and effort. Thereafter, to support the operation of the BWTS unit on the carrier gas vessel, it is necessary to re-calculate the pump pressure to ascertain whether the installed pump has sufficient capacity for the operation of additional BWTS systems. After the calculation has been done, the required pump pressure is 16.62 m, with the same water debit with the previous pump that is 350 m3 / hour. Because the required pump pressure is still much smaller than the pump head that is already installed, there is no need for pump switching to operate the BWTS.

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 623.863 Ben r-1 3100018074839
Uncontrolled Keywords: Ballast Water Treatment, Invasi, BWTS, Pompa, Gas Carrier.
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM731 Marine Engines
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Bendesa I Putu Dewangga Putra
Date Deposited: 27 Mar 2018 03:18
Last Modified: 27 Jul 2020 09:01
URI: http://repository.its.ac.id/id/eprint/50149