Kajian Modifikasi Fasilitas Produksi Kompressor C-102 pada Lapangan Kerja CPP PT. Pertamina Hulu Energi (PHE WMO) dengan Menggunakan Gas Conditioning Unit Dalam Rangka Mengurangi Unplanned Shutdown

Bramantio, Bartolomeus Widi (2018) Kajian Modifikasi Fasilitas Produksi Kompressor C-102 pada Lapangan Kerja CPP PT. Pertamina Hulu Energi (PHE WMO) dengan Menggunakan Gas Conditioning Unit Dalam Rangka Mengurangi Unplanned Shutdown. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2113100177-Undergraduate_Theses.pdf]
Preview
Text
2113100177-Undergraduate_Theses.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Salah satu permasalahan yang cukup membutuhkan perhatian adalah tingginya angka unplanned shutdown pada kompressor C-102 yang menyebabkan PT. PHE WMO kehilangan banyak kesempatan produksi. Teridentifikasi awal bahwa unplanned shutdown yang terjadi dikarenakan oleh penumpukan wax pada saluran floater yang menyebabkan oli tidak dapat teregenerasi. Dibutuhkan solusi untuk menangkap wax tersebut sehingga tidak terjadi penumpukan pada floater.
Kompressor C-102 akan diaudit dan dianalisa, sehingga permasalahan yang terjadi dapat diketahui dengan baik. Dengan menggunakan metode root cause analysis (RCA), permasalahan yang terjadi dapat diidentifikasi sampai kepada akar permasalahanya dan diharapkan dengan mengetahuinya dapat ditemukan solusi yang paling sesuai terhadap permasalahan tersebut. Kemudian kajian terhadap pemasangan gas conditioning unit (GCU) akan dianalisa dari segi biaya dan efektivitas.
Dengan digunakanya metode RCA, maka dapat didapatkan akar permasalahan yang menjadi dasar untuk analisa implementasi sebuah GCU. Diharapkan dengan pemasangan GCU, jumlah unplanned shutdown pada kompressor C-102 dapat menurun dan dapat mengurangi kehilangan kesempatan produksi yang ada pada perusahaan PHE WMO. ========================================================================================================
When producing oil and gas, PT. PHE WMO are vulnerable to face many problems that can caused a lot of loss production opportunity. One of many problems that require immediate attention is high unplanned shutdown on compressor C-102 that caused PT. PHE WMO to lose many production opportunity. Suspected that wax plug the floater on the seal oil system, that caused the oil regeneration system to be failed. A filtration system is needed to remove the wax from the process gas to prevent a plugging on the floater.
Compressor C-102 will be audited and analysed so the main problem can be identified. Using Root Cause Analysis (RCA) method, problems that happened can be identified to the core of the problems itself and with that can be a guidance to the process of implementing a GCU if it is a possible solution or not from a cost and effectiveness perspective.
On this final project, with the used of RCA method on determining the root cause of the problem, is hoped to be a crucial information on clearing the problems that happening and can lower the unplanned shutdown number as well on the compressor C-102

Item Type: Thesis (Undergraduate)
Additional Information: RSM 621.67 Bra k-1 3100018075018
Uncontrolled Keywords: Compressor C-102; Root Cause Analysis; Unplanned Shutdown
Subjects: T Technology > TJ Mechanical engineering and machinery
T Technology > TJ Mechanical engineering and machinery > TJ990 Compressors
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Bartolomeus Widi Bramantio
Date Deposited: 14 Mar 2018 05:46
Last Modified: 04 Aug 2020 06:15
URI: http://repository.its.ac.id/id/eprint/50284

Actions (login required)

View Item View Item