Analisa Perencanaan Sistem Pengkondisian Udara Untuk Kapal FPB 28 BC

Najamuddin, . (2004) Analisa Perencanaan Sistem Pengkondisian Udara Untuk Kapal FPB 28 BC. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
4200109602 - Undergraduate - Thesis.pdf - Published Version

Download (7MB) | Preview

Abstract

Pada kapal FPB ~8 BC milik Dinas Bea· dan Cukai yang awal pembuatannya t'ahun 1981 hanya dilengkapi s1stem ventilasi dengan menggunakan kipas pada saluran udara yang menghubungkan ruangan ! - ruangan akomodasi. Karena adanya sumber - sumber panas yang mempengaruhi suhu udara didalam ruangan, maka diperlukan suatu sistem pengkondisian udara untuk menciptakan kenyamanan dan kesehaiwz pare awak di kapal. Dalam perencanaan sistem pengkondisian udara dilakukan pengumpulan data - data yang terkait dengan proses perhitungan jumlah beban kalor yang mempengaruhi, selanjutnya diketahui besarnya daycr kipa.1· udara dan kompresor yanf! dibutuhkan serta pertimbangan pemmbangan penggunaan s1stem AC semral dan AC split. Dan has1! .. mal1sa di.~'!tahui besamya j?tmlah beban panas sens1o<!i 1.: ~II' dan latm 0. 7 kW a(m seul/u.J r;<ungp, JGtlg d1kond1S1kan dan kebwuhan daya listnk dari sis1em yang d1gunak011 sehesar 3.- : f!' serw e~1mras1 h1aya - bicrva wmg okcm diserap dalcmz pengoperaS/((/IIl,I'CI. St?l11ngga dapal dipastif.:an bahwa sistem ycmg digunakan mennliki keun/ungan baik dari segi teknis maupun secara ekonom is. ======================================================================================================================== The FPB 28 IJC owned by Bea and Cukai where built in 1981 was equipped ventilation system with fan in dueling system to distribute air in accommodation rooms. Because there are mairy heating source to increase air temperature in rooms, so it need an air conditioning system to create a comfortable and a healthy condition for ship crews. In planning uf the air conditioning system, it search all data about to count a result of heating source where influence the rooms. The next action will get a result of power capacities of the system where needed, and so the practice in use the system between central and split system of air conditioning. hom the SUIIIIIIlll) ana(v:e where done, can be found a resiilt of sensrble calor 7,2 kll and latent calor 0. 7 kfV from all the rooms then a pou er capacrties of system where needed 3, 7 kll'. Also estimatmg tire cost of system along operated. and so can make sure the system where used hm·i11g a ci~<'CI!' cosr 1111h a beuer pe1jormance that look from teclmrque and economy result

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 623.853 7 Naj a
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM293 Shipping--Indonesia--Safety measures
Divisions: Faculty of Marine Technology > Ocean Engineering > (S1) Undergraduate Theses
Depositing User: ansi aflacha
Date Deposited: 02 Mar 2018 03:41
Last Modified: 02 Mar 2018 03:41
URI: http://repository.its.ac.id/id/eprint/51420

Actions (login required)

View Item View Item