Program peningkatan kualitas dapat dilakukan melalui analisis kapabilitas dan evaluasi terhadap pergeseran proses dari periode ke periode. Salah satu cara untuk meningkatkan kualitas produksi air minum di PDAM Surya Sembada Surabaya adalah melakukan analisis kapabilitas proses dan menguji peningkatan proses dari bulan ke bulan atau dari semester ke semester. Penelitian ini bertujuan untuk menganalisis indeks kapabilitas proses produksi air minum pada Januari – Juni 2012 dan Juli Desember 2012 berdasarkan 3 variabel kualitas air minum yaitu kekeruhan, alkanita, karbondioksida. Juga menguji peningkatan proses dari periode Januari-Juni 2012 ke Juli-Desember
2012. Metode yang digunakan adalah peta kendali secara multivariate dan univariat, hal ini dikarenakan variabel alkanitas dan karbondioksida saling berkorelasi maka indeks kapabilitas diukur secara multivariat dan peta kendali yang digunakan adalah peta T2 Hotelling dan Generalized Variance. Sedangkan untuk analisis kapabilitas berdasarkan kekeruhan digunakan indeks kabilitas
univariat dan peta x- dan R . Dengan menggunakan Manova dapat disimpulkan
bahwa ada pergeseran proses yang signifikan pada periode Januari-Juni 2012
dan Juli –Desember 2012. Berdasarkan peta kendali T2 Hotelling dan Generalized Variance proses air produksi tidak dalam kondisi terkendali karena ada salah satu titik berada di luar batas kendali dan penyebabnya adalah alkanitas. Tetapi jika proses diperbaiki sehingga terkendali maka indeks kapabilitas berdasarkan alkanitas dan karbondioksida dapat mencapai lebih dari 1, yaitu 2,26 pada bulan Januari - Juni 2012 dan 2,94 pada bulan Juli -
Desember 2012, artinya proses kapabel. hasil peta kendali x- dan R tidak dalam
kondisi terkendali hal ini dikarenakan ada salah satu titik yang berada diluar
batas kendali dan penyebabnya adalah faktor musim penghujan dan banyaknya limbah pabrik maupun rumah tangga yang dibuang kesungai yang menjadi air
baku PDAM Surya Sembada Surabaya. Tetapi jika proses diperbaiki sehingga terkendali maka proses dapat menjadi kapabel karena kriteria kapabel terpenuhi yaitu indeks kapabilitas Cpu > 1. Cpu mencapai 10,76 pada bulan Januari - Juni 2012 dan 16,65 pada bulan Juli Desember 2012.
==========================================================================================
Quality improvement program can be done through analysis and evaluation capabilities of the process shift from period to period. One way to improve the production quality of drinking water in the taps Solar Sembada Surabaya is a process capability analysis and test process improvement from month to month or from half to half. This study aims to analyze the production process capability index of drinking water in January-June 2012 and July in December 2012 by three variables, namely the quality of drinking water turbidity, alkanita, carbon dioxide. Also test the improvement process of the period from January to June,
2012 to July to December 2012. The method used is as multivariate control chart and univariate, this is because the variables correlated alkanitas and carbon dioxide then measured multivariate capability index and map control used is the map T2 Hotelling and Generalized Variance. As for the analysis capabilities
based on turbidity used univariate and maps kabilitas index x- and R. By using
Manova can be concluded that there is a significant shift in the period January to
June 2012 and July 2012. Based -Desember T2 Hotelling control chart and
Generalized Variance water production process is not under control because
there is one point is outside the control limit and cause is alkanitas. But if the process is improved so that controlled the capability index based alkanitas and carbon dioxide can reach more than 1, 2.26 in January to June 2012 and 2.94 in
the month of July to December 2012, meaning that the process capable. x-
control chart results and R are not in controlled conditions it is because there is
one point that is beyond the control and the cause is a factor of the rainy season and the number of factories and household waste being dumped into the river that became the raw water taps Solar Sembada Surabaya. But if the process is improved so that the process can be controlled so capable as the criteria are met, namely capable CPU capability index > 1. The cpu reached 10.76 in the month of January to June 2012 and 16.65 in July December 2012.

Item Type: Thesis (Undergraduate)
Additional Information: RSSt 519.535 4 Hud a
Uncontrolled Keywords: control multivariate diagram, control univariate diagram, capability process index, peta kendali multivariat, peta kendali univariat, indeks kapabilitas proses
Subjects: H Social Sciences > HA Statistics
Q Science > QA Mathematics
Divisions: Faculty of Mathematics and Science > Statistics > 49201-(S1) Undergraduate Thesis
Depositing User: Eny Widiastuti -
Date Deposited: 10 Apr 2018 09:38
Last Modified: 10 Apr 2018 09:38
URI: http://repository.its.ac.id/id/eprint/51727

Actions (login required)

View Item View Item