Studi Operasi Paralel Jaringan Distribusi yang Disuplai oleh Satu Gardu Induk pada Sistem Kelistrikan Distribusi Jawa Tengah. Studi Kasus : GI Srondol Semarang

Anam, Muhammad Khoirul (2018) Studi Operasi Paralel Jaringan Distribusi yang Disuplai oleh Satu Gardu Induk pada Sistem Kelistrikan Distribusi Jawa Tengah. Studi Kasus : GI Srondol Semarang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111440000204-Undergraduate_Theses.pdf]
Preview
Text
07111440000204-Undergraduate_Theses.pdf - Accepted Version

Download (1MB) | Preview

Abstract

Jaringan distribusi tenaga listrik biasanya beroperasi menggunakan sistem distribusi radial, untuk meningkatkan keandalan jaringan distribusi dari sisi kualitas serta kontiyuitas penyaluran daya listriknya perlu dilakukan modifikasi sistem distribusi dari radial menjadi loop, perubahan jaringan distribusi terjadi karena dua kemungkinan. Pertama untuk mengoptimalkan operasi jaringan dengan tujuan mengurangi penurunan tegangan dan rugi daya sehingga keandalan sistem meningkat. Kedua ketika dibutuhkan pelimpahan daya dari satu penyulang ke yang lainnya, sebagai tindakan pencegahan dari kelebihan beban atau bahkan pemutusan beban. Sebagai contoh dalam kasus kegagalan operasi paralel di penyulang gardu induk Srondol pada kelistrikan distribusi Jawa Tengah. Dari hasil penelitian ini, didapatkan bahwa analisis yang akurat dan tepat dari kondisi eksisting penyulang yang akan diparalel dapat membantu untuk keberhasilan operasi sistem distribusi, menghindari gangguan yang signifikan dan mencegah terjadinya pemadaman pelanggan. Pada kondisi normal dari hasil simulasi Load Flow ETAP diperoleh trafo 2 GI Srondol mengalami overload sebesar 799 A, sehingga menghindari pemadaman diperlukan pelimpahan beban. Dari operasi paralel penyulang SRL 1 dan SRL 3 terjadi peningkatan arus yang signifikan pada penyulang SRL 1 sebesar 588 A yang mengakibatkan CB SRL 1 menjadi trip, sehingga terjadi pelimpahan beban ke trafo 2 sebesar 1094 A dan mengakibatkan pemadaman total pada trafo 2. Sedangkan saat operasi paralel penyulang SRL 2 dan SRL 3 peningkatan arus yang terjadi lebih kecil, sehingga sistem masih dalam kondisi aman dan proses pelimpahan beban berhasil dilakukan. ============= Power distribution network usually operates using radial distribution system to improve the reliability of the distribution network in terms of quality and continuity distribution. Electrical power needs to be modified from radial to loop on the aspect of distribution system. Distribution network changes occur due to two possibilities. First to optimize the network operation with the aim of reducing the voltage drop and loss of power so that the reliability of the system increases. Secondly is when power is needed from one feeder to another, as a precautionary measure of overloading or even breaking the load. For example in the case of a parallel operation failure in the Srondol substation relay on the Central Java distribution of electricity. From the results of this study, it was found that an accurate and precise analysis of the existing condition of the feeder to be paralleled can help for the successful operation of the distribution system, avoiding significant disruptions and preventing the occurrence of customer outages. Under normal conditions of Load Flow ETAP simulation results, it has been obtained 2 GI Srondol transformer which has an overload of 799 A, thus avoiding the blackout required to overload. From the parallel feeder operation of SRL 1 and SRL 3 there was a significant additional current on feeder of SRL 1 of 588 A which resulted in CB SRL 1 being a trip, resulting in an overload to transformer 2 of 1094 A and resulted in total blackout at transformer 2. While during operation parallel feeder SRL 2 and SRL 3 additional current that occurs smaller, so the system is still in a safe condition and the load delegation process has been successfully done.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Jaringan Distribusi, Operasi Paralel, Peningkatan Arus, Additional Currents, Distribution Networks, Parallel Operation
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1010 Electric power system stability. Electric filters, Passive.
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK7870.23 Reliability. Failures
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Muhammad Khoirul Anam
Date Deposited: 30 Aug 2018 03:00
Last Modified: 09 Mar 2021 06:56
URI: http://repository.its.ac.id/id/eprint/52448

Actions (login required)

View Item View Item