Pratama, Revan Arwisi (2018) Analisis Keandalan Sebagai Dasar Optimasi Interval Pemeliharaan Pada Control Valve HP Main Level Steam Drum PLTGUPT PJB UP GRESIK. Masters thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
09211650013052-Master_theses.pdf - Accepted Version Download (2MB) | Preview |
Abstract
PT Pembangkitan Jawa Bali merupakan salah satu anak perusahaan PT PLN (persero) yang bergerak di bidang pembangkitan tenaga listrik. PT PJB bergerak diberbagai bidang pembangkitan kelistrikan seperti Operation & maintenance pembangkit, Jasa konstruksi pembangkit, dan pembangkitan listrik itu sendiri. Salah satu Pembangkit PT PJB adalah UP Gresik. Banyak sekali alat pendukung pembangkit di UP Gresik, Salah satunya adalah Control valve HP Main Level Drum Heat Recovery Steam Generator ( HRSG ). Control valve ini merupakan salah satu alat yang gunanya sebagai pengatur level steam drum HRSG. Ketika terjadi gangguan pada control valve tersebut dapat mengganggu produksi steam yang nantinya akan berpengaruh juga pada daya MW yang dihasilkan oleh Steam Turbin itu sendiri. Pada 2 tahun terakhir, sering terjadi kerusakan pada control valve beserta komponen pendukungnya yang menyebabkan kinerja dari UP Gresik sendiri terganggu. Karena hal itu perlu dilakukan penelitian untuk menganalisa keandalan dan optimalisasi interval pemeliharaan guna menjaga keandalan dari control valve. Setelah dlakukan analisis keandalan diketahui bahwa CV tersebut sudah memasuki fase wear out pada kurva laju keandalan. Dengan pemeliharaan preventive yang dilakukan berdasarkan analisa keandalan, gangguan CV dapat dikurangi sehingga keandalan CV meningkat sehingga derating pembangkit yang menyebabkan kerugian dapat dikurangi. ================PT Pembangkitan Jawa Bali is a subsidiary of PT PLN (persero) which is engaged in power generation. PT PJB is engaged in various power generation fields such as Operation & Maintenance of power plants, power plants construction services, and electricity generation. One of Power plant owned PT PJB is UP Gresik. There is lots of support equipment in UP Gresik, one of them is Control valve HP Main Level Drum Heat Recovery Steam Generator (HRSG). This Control Valve is one of tool that use as level regulator Steam Drum HRSG. When there is disturbance to control valve, can interfere with production of steam which will also affect the MW power generated by steam turbine itself. In last 2 years, disrurbance in control valve and its supporting component increased, caused the performance of UP Gresik itself distrupted.Because of that, it is necessary to conduct research to analyze the reliability and optimization of maintenance to maintain the reliability of the control valve. After reliability analisis, we know that CV entered wear out phase in failure rate graph. With preventive maintenance based reliability analysis, CV disturbancescan be reduced so power plant derating that caused losses income can be reduced
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Control Valve, Hazard Rate, Preventive maintenance, Reliability, |
Subjects: | T Technology > T Technology (General) T Technology > T Technology (General) > T174 Technological forecasting T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK7870.23 Reliability. Failures |
Divisions: | Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis |
Depositing User: | Revan Arwisi Pratama |
Date Deposited: | 24 Nov 2018 03:00 |
Last Modified: | 21 Apr 2021 09:57 |
URI: | http://repository.its.ac.id/id/eprint/53083 |
Actions (login required)
View Item |