Rahmawati, Dyah (2018) Alternatif Perencanaan Perbaikan Struktur Pondasi pada Gudang No.3 PT. AKR Corporindo Tbk di Margomulyo. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
03111440000018_Undergraduate_Theses.pdf - Accepted Version Download (4MB) | Preview |
Abstract
Gudang No.3 PT. AKR Corporindo Tbk yang terletak di Margomulyo, Surabaya merupakan salah infrastruktur logistik yang digunakan sebagai tempat penyimpanan dan bongkar muat bubuk soda. Gudang tersebut memiliki luas 72 x 32 m2. Saat ini, gudang telah mengalami kerusakan akibat adanya perbedaan penurunan (differential settlement) hingga sedalam -20 cm. Hal tersebut diperkirakan disebabkan oleh kondisi tanah dasar yang merupakan tanah lunak dan beban timbunan yang cukup besar. Sebelumnya, pada gudang tersebut telah digunakan tiang pancang sebagai pondasinya, namun penurunan tetap terjadi. Oleh sebab itu akan direncanakan perbaikan pada struktur pondasi dibawah gudang agar penurunan yang terjadi tidak semakin dalam dan merusak struktur atas.
Dalam penelitian Tugas Akhir ini, dilakukan analisis kondisi eksisting gudang untuk mengetahui kondisi keamanan gudang sehingga dapat ditentukan perencanaan yang aman. Sebelumnya, kondisi Gudang yang mengalami kerusakan ini terjadi pada area pondasi tepi Gudang akibat penurunan yang cukup besar pada area tengah Gudang, hal tersebut dapat terjadi karena eksisting Gudang sebelumnya dibuat menyatu antara pelat lantai dengan struktur atas Gudang. Sehingga, dalam perencanaan Tugas akhir ini direncanakan perbaikan struktur pondasi tepi dan dilakukan perencanaan ulang untuk pondasi area tengah dengan sistem slab on pile, dimana antara pondasi tepi dan pondasi area tengah Gudang dibuat terpisah (dilatasi) sehingga penurunan yang terjadi tidak akan mengakibatkan kerusakan pada struktur atasnya. Perbaikan pada pondasi tepi gudang direncanakan dengan dua alternatif, yaitu pondasi bore pile dan pondasi tiang pancang. Sedangkan untuk perbaikan area tengah gudang direncanakan pondasi tiang pancang grup dengan metode pelaksanaan injection pile. Berdasarkan hasil penelitian dan perencanaan dalam tugas akhir ini, alternatif perencanaan pondasi yang tepat untuk area tepi gudang adalah dengan pondasi tiang pancang persegi berukuran 45cm x 45cm sedalam 28 m. Pemilihan tiang pancang tersebut dikarenakan pelaksanaannya lebih mudah dan tepat untuk lokasi tersebut serta lebih hemat secara biaya dibandingkan dengan pondasi bored pile. Sedangkan untuk area tengah gudang, diperlukan sebanyak 612 tiang pancang persegi dengan ukuran 25cm x 25cm sedalam 28 m untuk dapat memikul beban timbunan bubuk soda setinggi 7m. Dan setelah dikontrol over all stability menggunakan program plaxis 8.2 didapatkan nilai SF 1,84 > 1,5 sehingga perencanaan tersebut sudah memenuhi faktor keamanan yang diijinkan.
Dan berdasarkan hasil perhitungan RAB yang dibutuhkan untuk memperbaiki struktur pondasi gudang PT. AKR Corporindo Tbk, diperlukan biaya total seluruh perbaikan sebesar Rp.18.493.007.979,22.
=========================================================================================================
Warehouse No.3 PT. AKR Corporindo that located in Margomulyo, Surabaya is one of the logistics infrastructure used as storage and unloading of soda powder. The warehouse has an area of 72 x 32 m2. Currently, the warehouses have been damaged due to the differential settlement to as deep as -20 cm. This is thought to be due to the basic soil conditions which are soft soils and large embankment loads. Previously, in the warehouse has been used pile as its foundation, but the decline still occurs. Therefore it will be planned improvements on the foundation structure under the warehous, so that the decline is not deeper and damage the upper structure.
In this Final Project, analysis of the existing condition of warehouse to know the condition of the security of the warehouse so that it is safe when done the repair. The method of improvement used in the writing of this final projectis is create a separate warehouse edge foundation with the foundation of the central area of the warehouse, where for the warehouse edge foundation is planned with two alternatives, bored pile and pile foundation. As for the improvement of the central area of the warehouse is planned with pile group foundation with pile injection system. Based on the results of research and planning in this final project, the alternative of proper foundation planning for warehouse edge area is with square pile foundation measuring 45cm x 45cm as deep as 28 m. Selection of this alternatif is because the implementation is easier and appropriate for the location and more cost-effective compared to the foundation of bored pile. As for the central area of the warehouse, it takes as many as 612 square piles with size 25cm x 25cm as deep as 28 m to be able to shoulder the burden of soda powder pile as high as 7m. And after controlled over all stability using plaxis 8.2 program obtained the value of SF 1.84> 1.5 so that the planning already meet the permitted security factors.
And based on the calculation of RAB needed to improve the foundation structure of the warehouse PT. AKR Corporindo Tbk, the total cost of all repairs is Rp. 18.493.007.979,22
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSS 624.15 Rah a-1 3100018077849 |
Uncontrolled Keywords: | Pondasi;Bored Pile;Tiang Pancang;Tanah Lunak;Margomulyo |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA347 Finite Element Method T Technology > TA Engineering (General). Civil engineering (General) > TA749 Soil stabilization T Technology > TA Engineering (General). Civil engineering (General) > TA775 Foundations. |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Rahmawati Dyah |
Date Deposited: | 07 Jan 2019 07:04 |
Last Modified: | 13 Nov 2020 02:34 |
URI: | http://repository.its.ac.id/id/eprint/53742 |