Perencanaan Ulang Struktur Bangunan Gedung Kantor Mitra Yatim Mandiri dengan Metode Sistem Rangka Pemikul Momen Menengah

Aulia, Alvi and Herfangga, Teguh Editiya (2018) Perencanaan Ulang Struktur Bangunan Gedung Kantor Mitra Yatim Mandiri dengan Metode Sistem Rangka Pemikul Momen Menengah. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
10111500000051-10111500000092-Non_Degree.pdf - Published Version
Restricted to Repository staff only until 1 July 2020.

Download (42MB) | Request a copy

Abstract

Penyusunan tugas akhir yang berjudul Perencanaan Ulang Struktur Bangunan Gedung Kantor Mitra Yatim Mandiri dengan Metode Sistem Rangka Pemikul Momen Menengah ini mengambil objek Kantor Mitra Yatim Mandiri yang terletak di Jalan Raya Sarirogo Sidoarjo. Bangunan gedung ini terdiri dari 7 lantai dan akan direncanakan ulang 4 lantai dengan tinggi 19 m. Pada tugas akhir ini akan dibahas mengenai perencanaan struktur menggunakan metode sistem rangka pemikul momen menengah. Perhitungan stuktur menggunakan metode sistem rangka pemikul momen menengah yang mengacu pada SNI 2847-2013, SNI 1726-2012, dan SNI 1727-2013. Perhitungan yang akan dilakukan dalam tugas akhir ini yaitu perhitungan struktur atas seperti balok, kolom, pelat lantai, pelat tangga dan struktur bawah seperti sloof dan pile cap, dengan pondasi tiang pancang. Bahan utama penyususan stuktur adalah beton bertulang. Karena bangunan masuk kategori bangunan beraturan maka dalam perencanaan beban akibat gempa menggunakan statik ekivalen. Metode pelaksanaan yang ditinjau dalam tugas akhir ini adalah step pekerjaan balok beserta uraiannya hingga menghasilkan perhitungan volume bestat sehingga dapat digunakan dalam pelaksanaan di lapangan. Hasil dari perhitungan perencanaan ini berupa dalam bentuk laporan perhitungan struktur dengan disertai gambar yang dapat dijadikan referensi dalam pelaksanaan pembangunan kedepannya ============= The little of this research is redesign of official “Mitra Yatim Mandiri” with Intermediate Moment Resisting Frame Method the object research of official “Mitra Yatim Mandiri” which is located at Raya Sarirogo Sidoarjo. This building has 7 floors and will be modified to 4 floors with 19 m of height. In this final project will be discussed about structural planning using intermediate moment resisting frame method. The calculation of the structure is using the intermediate moment resisting frame method that referring to Indonesia National Standard 2847-2013, Indonesia National Standard 1726-2012,and Indonesia National Standard 1727-2013. Then The calculation of this research refers is the upper structure contains of beam, column, slab and stair’s slab and the down structure contains of sloof dan pile cap with the foundation using piles. Main material as the structure composer is reinforced concrete. Because the building is categorized as an uniform building so at the load planning due to the seismic effect is using static equivalent. The implementation method reviewed in this final project is about block working step with the description on it to get the bestat volume calculation so it can be applied for construction. The result of this design calculation is in the form of final project report and shop drawing that can be used as reference in the implementation of future development.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Intermediate Moment Resisting Frame, Static Equivalent, Intermediate Moment Resisting Frame, Static Equivalent
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
Divisions: Faculty of Vocational > Civil Infrastructure Engineering
Depositing User: Alvi Aulia
Date Deposited: 14 Feb 2019 07:52
Last Modified: 14 Feb 2019 07:52
URI: http://repository.its.ac.id/id/eprint/53875

Actions (login required)

View Item View Item