Arwis, Nabila An-Nisaa Arwis (2018) Analisa Laju Sedimentasi di Area Jetty PLTU Banten 2 Labuan. Undergraduate thesis, Institut Teknologi Sepuluh nopember.
Preview |
Text
04311440000025-Undergraduate_Thesis.pdf - Accepted Version Download (5MB) | Preview |
Abstract
Kebutuhan energi listrik terus mengalami peningkatan sampai saat ini, sehingga banyak cara yang dilakukan oleh perusahaan pembangkit listrik untuk terus mengembangkan potensi energi guna memenuhi kebutuhan tersebut. Salah satunya adalah proyek percepatan pembangunan PLTU 10.000 MW. PLTU Banten 2 Labuan memiliki kapasitas total 2 x 300 MW sehingga memerlukan supply bahan bakar batu bara yang aman dan tercukupi secara kuantitas sehingga transportasi tongkang yang mengangkut batu bara diharapkan dapat bersandar di dermaga untuk memenuhi kebutuhan tersebut. Tugas Akhir bertujuan untuk mengetahui besarnya laju sedimen dan untuk mengetahui kapan dilakukannya pengerukan di daerah yang terkena dampak sedimentasi. Pengerjaan Tugas Akhir ini menggunakan software Delft3D . Setelah dilakuka analisa dan perhitungan didapat laju sedimen 13 cm/tahun. Sehingga untuk prediksi waktu maintenance dredging dilakukan setiap 7-8 tahun.=================================================================================Electrical energy needs continue to increase until now, so many ways by power companies to continue to develop energy potential to meet those needs. One of them is the acceleration project of PLTU 10,000 MW. PLTU Banten 2 Labuan has a total capacity of 2 x 300 MW so it needs a supply of coal fuel that is safe and sufficient in quantity so that barge transportation carrying coal is expected to lean on the jetty to meet those needs. Final Project aims to determine the magnitude of the sediment rate and to know when dredging occurs in areas affected by sedimentation. The execution of this final project using the software Delft3D. After doing analysis and calculation, it can determine the sediment is 13 cm/year. So for to prediction of maintenance dredging time is done by every 7-8 year
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TC Hydraulic engineering. Ocean engineering > TC205 Harbors--Design and construction. T Technology > TC Hydraulic engineering. Ocean engineering > TC357 Harbor Engineering. Piers, quays, and wharves T Technology > TC Hydraulic engineering. Ocean engineering > TC424 Water levels |
Divisions: | Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis |
Depositing User: | Nabila Annisaa Arwis |
Date Deposited: | 18 Jun 2021 13:26 |
Last Modified: | 18 Jun 2021 13:26 |
URI: | http://repository.its.ac.id/id/eprint/53971 |
Actions (login required)
View Item |