Perencanaan Jadwal dan Anggaran Biaya Pelaksanaan Pembangunan Hotel Gold Vitel Surabaya pada Lantai 12 sampai dengan Lantai 16 (Helipad dan Lift Machine Room)

Saragi, Yosi Arta and Klistin, Galuh Fitriani (2018) Perencanaan Jadwal dan Anggaran Biaya Pelaksanaan Pembangunan Hotel Gold Vitel Surabaya pada Lantai 12 sampai dengan Lantai 16 (Helipad dan Lift Machine Room). Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111500000056-10111500000081-Non_Degree.pdf]
Preview
Text
10111500000056-10111500000081-Non_Degree.pdf - Accepted Version

Download (14MB) | Preview

Abstract

Gedung hotel Gold Vitel Surabaya adalah sebuah gedung penginapan 20 lantai dengan luas 6229,13 m2 yang berlokasi di Jalan Basuki Rahmat No 147. Pada pekerjaan proyek akhir ini meliputi penjadwalan waktu dan anggaran biaya dalam pelaksanaan pekerjaan struktur pembangunan Hotel Gold Vitel Surabaya dari lantai 12 sampai lantai 16 termasuk helipad dan lift machine room.Pada proyek ini metode pengecoran dengan menggunakan beton ready mix.Dalam hal pelaksanaan pada proyek dari lantai 12 sampai dengan lantai 16 dibantu dengan menggunakan alat berat diantaranya yaitu tower crane QTZ-40 (4010) dan concrete pump jenis super long boom. Rencana anggaran biaya pelaksanaan berdasarkan harga survey dan brosur. Sedangkan untuk waktu pelaksanaan dilakukan dengan analisa mulai dari kapsitas alat, produktivitas, durasi dan penyusunan setiap item pekerjaan. Perhitungan waktu dan biaya pelaksanaan menggunakan sumber referensi utama dari Ir. A. Soedrajat s, Analisa (cara modern) Anggaran Biaya Pelaksanaan, Penerbit “Nova”, Bandung. Hasil durasi dan produktivitas tiap pekerjaan yang dihitung sebelumnya dapat dijadikan input pada aplikasi software MS Project 2013 dan Microsoft Excel untuk membantu dalam merencanakan penjadwalan pelaksanaan proyek beserta dengan metode pelaksanaannya. Berdasarkan hasil analisa diperoleh rencana anggaran biaya pelaksanaan untuk struktur beton pada proyek ini sebesar Rp. 1.791.967.082,29 dan waktu pelaksanaan pembangunan proyek adalah selama 62 hari.
==================================================================================================
Hotel Gold Vitel Surabaya is a 20th floor building with an area of 6229.13 m2, its located at Jalan Basuki Rahmat No. 147. In this final project, includes scheduling time and cost budgeting in the execution of construction of Hotel Gold Vitel Surabaya from 12th floor until 16th floor including helipad and elevator machine room.This project of casting method is using ready mix concrete. In case of execution on project from floor 12 up to floor 16 assisted by using heavy equipment such as tower crane QTZ-40 (4010) and concrete pump type of super long boom. The implementation budget plan based on survey prices and brochures.While for the execution time, we analyzed the tool capacity, productivity, duration and preparation of each work item. Calculation of time and cost of implementation using the main reference source from Ir. A. Soedrajat s, Analysis (modern way) Budget Cost Implementation, Publisher "Nova", Bandung. The duration and productivity of each work calculated before, can be used as an input in MS Project 2013 and Microsoft Excel software applications to assist in planning the scheduling of project implementation along with the method of implementation. Based on the result of the analysis, the cost of implementation budget for concrete structure in this project is Rp. 1.791.967.082,29 and the project development time is 62 days.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Rencana anggaran biaya pelaksanaan,waktu pelaksanaan,helipad.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Yosi Arta Saragi
Date Deposited: 21 Jun 2021 01:39
Last Modified: 21 Jun 2021 01:39
URI: http://repository.its.ac.id/id/eprint/54107

Actions (login required)

View Item View Item