Putra, Adi Firmansyah (2018) Perencanaan Perkuatan Lereng Pada Jalan Tol Terbanggi Besar - Pematang Panggang Provinsi Lampung STA 46+400 - 47+050. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
03111645000032_Undergraduate_Theses.pdf - Accepted Version Download (9MB) | Preview |
Abstract
Pembangunan Jalan Tol Trans Sumatera dilakukan dengan tujuan untuk meningkatkan perekonomian di pulau Sumatera. Ruas jalan tol Sumatera terdiri dari Jalan tol Terbanggi Besar – Pematang Panggang, Pematang Panggang Kayuagung, Kisaran – Tebing Tinggi, serta Palembang – Tanjung Api – api. Pada tahun 2016 terdapat 3 ruas tambahan yaitu jalan tol Banda Aceh – Medan, Padang – Pekanbaru, dan Tebing Tinggi – Parapat. Dalam Tugas akhir ini akan membahas ruas jalan tol Terbanggi Besar – Pematang Pangga pada STA 46 +400 – 47+050. Pada STA tersebut terdapat lereng – lereng yang cukup tinggi yang bisa membahayakan pengguna jalan bahkan akan menimbulkan kerusakan struktur jalan tol itu sendiri.
Lereng tersebut akan dianalisa stabilitas untuk mengetahui apakah lereng mengalami kelongsoran atau tidak. Analisa stabilitas lereng menggunakan program bantu yang berbasis metode limit equilibrium dan menghasilkan SF dan momen penahan. Apabila SF kurang dari 1 maka perlu dilakukan perkuatan. Alternatif perkuatan yang digunakan adalah Bronjong,Turap, Ground Anchor, dan Soldier Pile. Perhitungan dilakukan dengan menggunakan 3 zona berdasarkan ketinggian lereng. Zona 1 pada ketinggian 1-3 meter, zona 2 pada ketinggian 3-7 meter dan zona 3 pada ketinggian 7 – 14 meter.
Dari hasil perhitungan, perkuatan yang cocok pada masing – masing zona berbeda. Hal ini dikarenakan ketinggian lereng yang bervariasi sehingga perkuatan tidak semua bisa dilaksanakan di lapangan. Hasil perhitungan didapat bahwa zona 1 meter memakai perkuatan Bronjong tanpa Subdrain. Zona 2 menggunakan Soldier Pile diameter 70 cm + Subdrain. Zona 3 menggunakan Soldier Pile diameter 100 cm + Subdrain. Subdrain pada masing – masing perkuatan direncanakan secara praktis karena pada perhitungan perkuatan sudah direncanakan SF 1.5 tanpa adanya Subdrain.
================================================================================== Trans Sumatera Highway is established to support the economics in the area of Sumatera. Trans Sumatera Toll Road consist Terbanggi Besar – Pematang Panggang, Pematang Panggang Kayuagung, Kisaran – Tebing Tinggi, serta Palembang – Tanjung Api – api. In this thesis, author would discuss about Terbanggi Besar- Pematang Pangga Highway in STA 46+400-47+050. Having a non-uniform contour, highway should be planned some cut and fill works. In this STA, there are several high slopes which could be dangerous to the users could even damaging the structure of highway itself.
Slope will be analyzed to know the stability of the slope. Stability analysis use software that provide equlibrium method and produce Safety Factor also resistance momen of the slope. If the Safety Factor of slope is less than 1,so the slope need more reinforcement. Several alternatives such as gabion, retaining wall, grouting, soldier pile are used to strengthen the slopes. Calculation was done by using 3 zones of height. First zone was on 1-3 meter, second zone was on 3-7 meter, and the last zone was on 7-14 meter height.
From calculation result, every slope have different reinforcement because of different high slopes in this area. It was obtained that first zone with 1-3 meter height used gabion strengthening without sub drain. Second zone used soldier pile + sub drain. The last zone used soldier pile and sub drain. In each strengthening, sub drain was planned practically because the strengthen calculation was already planned SF 1.5 without sub drain.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Lereng,Bronjong,Ground Anchor,Soldier Pile,Turap |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA455.S6 Soil (Materials of engineering and construction) |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Adi Firmansyah Putra |
Date Deposited: | 01 Jul 2021 08:05 |
Last Modified: | 01 Jul 2021 08:05 |
URI: | http://repository.its.ac.id/id/eprint/55020 |
Actions (login required)
View Item |