Analisis Availabilitas dengan Mempertimbangkan Inventori Spare part dan Penyangga Menggunakan Pendekatan Simulasi (Studi Kasus: PT Petrowidada)

Salsabila, Nabila Yuraisyah (2018) Analisis Availabilitas dengan Mempertimbangkan Inventori Spare part dan Penyangga Menggunakan Pendekatan Simulasi (Studi Kasus: PT Petrowidada). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02411440000048_Undergraduate_Thesis.pdf]
Preview
Text
02411440000048_Undergraduate_Thesis.pdf - Accepted Version

Download (1MB) | Preview

Abstract

PT Petrowidada merupakan satu-satunya perusahaan yang memproduksi Pythalic Anhydride di Indonesia. Konsumen PT Petrowidada mencakup 45 konsumen yang terdiri atas perusahaan cat dan plastik domestik maupun manca negara. Kapasitas produksi PT Petrowidada pada saat ini adalah 70000 MTPY atau kurang lebih sebanyak 240 Ton per hari. Pada saat ini, kapasitas produksi pada Pabrik PA PT Petrowidada berkurang, hal ini disebabkan karena availabilitas produksi yang menurun. Availabilitas produksi ini dipengaruhi oleh availabilitas spare part pada PT Petrowidada. Availabilitas juga dapat mempengaruhi calendar day. Calendar day adalah salah satu parameter utama dalam proses produksi karena dapat mempengaruhi customer service level perusahaan. Untuk melakukan efisiensi calendar day, dapat dilakukan dengan mengadakan inventori penyangga pada awal periode produksi. Inventori penyangga dapat mengatasi permasalahan starving dan blocking pada saat terjadi down time. Berdasarkan permasalahan tersebut, maka pada penelitian ini akan dilakukan analisis availabilitas dengan mempertimbangkan inventori spare part dan inventori penyangga. Metode yang digunakan dalam penelitian ini adalah metode simulasi sistem diskrit karena simulasi sistem diskrit dapat mengakomodasi perilaku acak dan ketergantungan antar variabel.
============================================================================================================
PT Petrowidada is the only company producing Pythalic Anhydride in Indonesia. The customers of PT Petrowidada include 45 companies consisting of domestic and foreign paints and plastics companies. PT Petrowidada's current production is 70.000 MTPY or approximately 240 Ton per day. At present, the production capacity of PT Petrowidada PA factory is decreased due to decreased production availability. Availability of this production is influenced by the availability of spare parts at PT Petrowidada. Availability can also affect calendar days. The calendar days is one of the main parameters in the production process as it may affect the level of customer service of the company. To perform efficiency of the calendar day, it can be done by creating the buffer inventory at the beginning of the production period. Buffer inventory can overcome starvation and blocking problems in the event of down time. Based on these cases, in this research will be analyzed the availability by considering inventory spare part and inventory buffer. The method used in this research is discrete event simulation because this method is able to accommodate the system complexity.

Item Type: Thesis (Undergraduate)
Additional Information: RSI 658.787 011 Sal p-1 3100018078578
Uncontrolled Keywords: availability, calendar day, spare part inventory, buffer inventory, discrete event simulation, availabilitas, calendar day, inventori spare part, inventori penyangga, simulasi kejadian diskrit
Subjects: T Technology > TS Manufactures > TS174 Maintainability (Engineering) . Reliability (Engineering)
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Salsabila Nabila Yuraisyah
Date Deposited: 22 Jan 2019 03:06
Last Modified: 21 Oct 2020 06:39
URI: http://repository.its.ac.id/id/eprint/55045

Actions (login required)

View Item View Item