Atmayani, Almedista Intan (2018) Estimasi Biaya dan Waktu Pembangunan Proyek LRT Jakarta Phase 1 Section 3. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
10111410000034-Undergraduate_Theses.pdf - Accepted Version Download (27MB) | Preview |
Abstract
Tingkat mobilitas yang tinggi pada Ibu Kota Jakarta membuat kebutuhan akan sarana dan prasarana transportasi terus meningkat. Salah satu sarana dan prasarana yang tengah diupayakan pemerintah adalah membangun transportasi umum, salah satunya yaitu LRT (Light Rail Transit). Pembangunan proyek LRT Jakarta ini direncanakan selama 610 hari atau sebelum diadakannya ASIAN GAMES 2018. Oleh karena itu diperlukan adanya metode pelaksanaan yang tepat agar proyek dapat selesai tepat waktu. Metode pelaksanan mencakup penentuan dari segi teknis seperti penentuan jumlah pekerja, jumlah dan jenis alat yang digunakan, analisis waktu proyek, dan biaya yang diperlukan.
Pada penulisan proyek akhir terapan ini meninjau pada Proyek LRT Jakarta Phase 1 yang menghubungkan wilayah Kelapa Gading dengan Velodrome dengan bentang 5,104 km yang terdiri dari 5 section. Analisis yang akan dibahas pada penulisan proyek akhir terapan ini yaitu pada section 3 sepanjang 1,053 km. Metode pelaksanaan yang dibahas dimulai dari pekerjaan bored pile, pekerjaan pile cap, pekerjaan pier, pekerjaan box girder, dan pekerjaan parapet. Metode pelaksanaan yang digunakan dalam proyek ini harus disesuaikan dengan kondisi lapangan yang sempit. Setelah menentukan setiap item pekerjaan, kemudian dilanjutkan dengan menghitung volume, menentukan jenis dan jumlah sumber daya yang digunakan, dan menganalisa harga material dan upah pekerja. Untuk standar harga yang digunakan menggunakan buku Jurnal Harga Satuan Bahan Bangunan dan Upah Pekerja Provinsi Jakarta tahun 2017.
Hasil dari analisis pengolahan dan perhitungan data pada penulisan proyek akhir terapan ini yaitu pekerjaan pembangunan proyek LRT Jakarta ini membutuhkan waktu selama 415 hari dengan biaya total sebesar Rp85.280.784.072.
=================================================================================================
The high level of mobility in the capital city of Jakarta makes the need for transportation facilities and infrastructure continues to increase. One of the facilities and infrastructure that the government is trying to build public transportation, one of which is LRT (Light Rail Transit). The construction of the Jakarta LRT project is planned for 610 days or prior to ASIAN GAMES 2018. Therefore, it is necessary to have a proper implementation method for the project to be completed on time. Methods of implementation include technical determinations such as the determination of the number of workers, the number and types of tools used, the analysis of project timing, and the costs required.
At the end of this final project, the project is reviewed by Jakarta Phase 1 LRT Project, which connects The Kelapa Gading area with Velodrome with span 5,104 km consisting of 5 sections. The analysis that will be discussed in the final project writing is on section 3 along 1.053 km. The implementation methods discussed start of bored pile work, pile cap job, pier job, and girder box job up to parapet. The implementation methods used in this project should be tailored to narrow field conditions. After determining each work item, then proceed by calculating the volume of work, determining the type and amount of resources used, and analyzing the material and wage prices of workers. For the standard price used using the prevailing price journals in Jakarta.
The result of processing, analysis and calculation of data on the writing of the final project applied is the wor of LRT Jakarta project development takes 415 days with a total cos of Rp85.280.784.072.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | LRT Jakarta Phase 1 section 3, biaya dan waktu |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TF Railroad engineering and operation T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc. |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4 |
Depositing User: | Almedista Intan Atmayani |
Date Deposited: | 15 Jul 2021 23:21 |
Last Modified: | 15 Jul 2021 23:21 |
URI: | http://repository.its.ac.id/id/eprint/55531 |
Actions (login required)
View Item |