Desain Modifikasi Struktur Gedung Asrama Lembaga Penjamin Mutu Pendidikan (Lpmp) Sumatera Barat Menggunakan Srpmk Dan Balok Prategang Pada Lantai Atap

Ageta, Muhammad Satrya (2018) Desain Modifikasi Struktur Gedung Asrama Lembaga Penjamin Mutu Pendidikan (Lpmp) Sumatera Barat Menggunakan Srpmk Dan Balok Prategang Pada Lantai Atap. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3116105051-Undergraduate_Thesis.pdf]
Preview
Text
3116105051-Undergraduate_Thesis.pdf - Accepted Version

Download (25MB) | Preview

Abstract

Kompleks Lembaga Penjamin Mutu Pendidikan (LPMP) terletak di Sumatera Barat, tepatnya berlokasi di Komplek Perguruan Tinggi Air Tawar, Kota Padang. Kebutuhan akan ruang dan kurangnya lahan pada komplek LPMP merupakan tantangan yang harus diatasi dalam pembangunan. Bangunan bertingkat banyak adalah salah satu solusi pembangunan terjadap kurangnya lahan dan ruang.
Perencanaan gedung asrama LPMP setinggi 10 lantai (± 40 m) dan dirancang menggunakan beton bertulang pada keseluruhan lantai, serta menggunakan beton prategang pada lantai ke 10 (lantai atap) yang akan didesain sebagai ruang ballroom tanpa ada struktur kolom ditengah ruangan sehingga ruang ballroom menjadi lebih nyaman dan luas dibandingkan dengan penggunaan balok nonpratekan yang akan menghasilkan dimensi yang lebih besar.
Pada era modern ini beton prategang merupakan salah satu teknologi struktur yang dikembangkan dan sering digunakan untuk pembangunan gedung bertingkat yang memiliki balok dengan bentang yang cukup panjang tanpa ada kolom ditengah bentang. Perancangan gedung asrama LPMP Padang dengan menggunakan balok beton prategang ini merupakan salah satu aplikasi penggunaan beton prategang pada gedung bertingkat.
Balok beton prategang pada gedung bertingkat memiliki kendala dari sifat beton prategang yang getas. Oleh karena itu perlu perencanaan khusus dalam desain balok beton prategang agar dapat bersifat daktail yang cukup untuk menahan beban gempa. Metode pelaksanaan pekerjaan balok beton prategang dengan metode penarikan posttension dan cast in situ, sehingga hubungan balok prategang dan kolom monolit. Struktur gedung LPMP menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK). Dimana sistem ini dirancang untuk daerah rawan gempa sesuai peraturan SNI 1726:2012, untuk pembebanan sesuai peraturan SNI 2847:2013, dan analisa struktur menggunakan program bantu SAP2000.
===================================================================The site of LPMP in Sumatra Barat is obviously located in the complex of Universitas Negeri Padang. The need of spaces and small area in the site are challenges that faced in the construction. Multi-storey buildings is one of solutions to overcome the problem.
The design construction of LPMP building is planned to be as high as 10 floors (± 40 m) and designed with reinforced concrete in each floor. Prestres-concrete will be used on the 10th floor for it is planned to be the ballroom with no reinforced column in the middle of the room in order to make it more spacious. It is better than using non-practical beam which resulting a bigger dimention.
In the modern era, prestres-concrete is one of developed structural-technology and often used in the construction of multi-storey buildings with a long beam without any column in the middle of the disquisition. The design of LPMP building which using prestres beam is one of implementation in the use of prestres concrete in multi-storey buildings.
The nature of prestres concrete in multi-storey buildings is brittle. Therefore, a special design is needed in designing the prestres beam, so it is able to bear the burden of earthquake. The execution method of prestres beam uses two methods; posttension and cast in situ method. Therefore, the connection between prestres beam and column is monolith. The design of LPMP building uses Moment Resisting Frame (SRPMK) which designed for earthquake-subject area as stated on SNI 1726:2012, the load which stated in SNI 2847:2013, and structure analyse that use SAP2000 programme.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Balok Beton Prategang, Sistem Rangka Pemikul Momen Khusus, Asrama LPMP Padang.
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses
Depositing User: Muhammad Satrya Ageta
Date Deposited: 28 Jun 2021 07:30
Last Modified: 28 Jun 2021 07:30
URI: http://repository.its.ac.id/id/eprint/56127

Actions (login required)

View Item View Item