Estimasi Waktu dan Biaya Pembangunan Pembangkit Listrik Mikro Hidro Kinetik di Kanal PLTU Paiton

Saputra, Ardany Wahyu (2018) Estimasi Waktu dan Biaya Pembangunan Pembangkit Listrik Mikro Hidro Kinetik di Kanal PLTU Paiton. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211440000051-Undergraduate_Thesis.pdf]
Preview
Text
04211440000051-Undergraduate_Thesis.pdf - Accepted Version

Download (4MB) | Preview

Abstract

Pembangunan pembangkit listrik tenaga mikro hidro (PLTMH) yang direncanakan oleh PLTU Paiton merupakan salah satu sumber energy terbarukan yang memanfaatkan aliran air kanal di PLTU Paiton hasil dari pendinginan kondensor. Dalam pembangunannya harus mempertimbangkan aspek non teknis seperti estimasi waktu pengerjaan dan biaya-biaya yang diperlukan dalam pembangunan PLTMH ini. Proses pertimbangan dilakukan dengan cara melakukan penjadwalan dan rincian biaya yang dibutuhkan dalam proses pembanguna. Proses penjadwalan dilakukan dengan menentukan sub-sub pekerjaan yang akan dilakukan beserta estimasi waktu dan sumber daya yang dibutuhkan. Sub pekerjaan kemudian disusun dengan mempertimbangkan pekerjaan pendahulu yang harus dilakukan. Hasil penyusunan akan membentuk lintasan seri dan paralel. Dari setiap lintasan akan diketahui estimasi waktu yang diperlukan dalam menyelesaikan pekerjaan dalam lintasan tersebut. Pada lintasan seri dan paralel akan dilakukan analisa berupa lintasan kritis pekerjaan. Lintasan kritis digunakan untuk mengeatahui sub-sub pekerjaan yang harus diperhatikan dalam pengerjaanya, agar proyek dapat selesai sesuai dengan yang direncanakan. Kemudian berdasarkan sumber daya yang dibutuhkan dalam sub pekerjaan dapat diketahui estimasi biaya yang diperlukan dalam pembangunan proyek tersebut. Dari analisa yang telah dilakukan didapatkan estimasi waktu pengerjaan proyek selama 392 hari dengan biaya yang dibutuhkan sebesar Rp. 1.981.492.000,00============================================================The construction of kinetic micro hydro power plant (PLTMH) planned by PLTU Paiton is one of the renewable energy resources that used the flow of channel water produced by the condenser cooling process. This construction must consider non-technical aspects such as the estimation of working time and also the costs. The estimation process is done by scheduling and arranging the detail costs needed for this construction. The scheduling process is done by determining sub-works that will be done along with the estimation of time and resources. Sub-works are arranged by considering prodesecor that must be done. The arrangement results will form the series and paralel lines. The time estimation needed in solving the work can be obtained from each line. Analysis in the form of a critical path will be done in both lines. Critical path line is used to find sub-works in its contruction, so the project can be done according to the plan. After that, based of the needed resources in the sub-work, the estimation cost that need for this project construction can be known. From the analysis that had been done, the time estimation for the project construction is 392 days with the required cost of Rp. 1,981,492,000.00

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: PLTMH, Proyek, Penjadwalan, Lintasan Kritis, Biaya
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Saputra Ardany Wahyu
Date Deposited: 28 Jun 2021 01:30
Last Modified: 28 Jun 2021 01:30
URI: http://repository.its.ac.id/id/eprint/56202

Actions (login required)

View Item View Item