Perencanaan Gedung Parkir Stadion Gelora Bung Tomo, Surabaya

Darmawan, Ario (2018) Perencanaan Gedung Parkir Stadion Gelora Bung Tomo, Surabaya. Undergraduate thesis, INSTITUT TEKNOLOGI SEPULUH NOPEMBER.

[thumbnail of 03111440000140-Undergraduate_Theses.pdf] Text
03111440000140-Undergraduate_Theses.pdf - Accepted Version
Restricted to Repository staff only

Download (4MB) | Request a copy

Abstract

Kota Surabaya adalah ibukota provinsi Jawa Timur, Indonesia yang merupakan kota terbesar kedua di Indonesia setelah Jakarta. Dengan jumlah penduduk yang hampir 3 juta jiwa sebagai kota metropolitan, Surabaya menjadi pusat kegiatan perekonomian di daerah Jawa Timur dan sekitarnya. Selain terkenal sebagai kota perdagangan dan industri, Surabaya juga dikenal sebagai kota yang menghasilkan atlet yang berprestasi. Surabaya memilki stadion sepak bola yaitu Stadion Gelora Bung Tomo atau sering disebut juga GBT yang terletak di Jalan Benowo Surabaya, Jawa Timur. Memliki tim sepak bola yang biasa disebut “persebaya” yang terkenal dan bagus, persebaya juga memilki suporter yang luar biasa, yaitu “BONEK”. Pendukung setia tim sepak bola Surabaya selalu datang dan mendukung saat persebaya bermain, hal ini menuntut Stadion Gelora Bung Tomo Surabaya memiliki fasilitas Stadion yang memadahi seperti gedung parkir. Sayangnya, Stadion Gelora Bung Tomo tidak memiliki fasilitas tersebut dan terpaksa pengunjung harus parkir di sembarangan jalan dan di gudang-gudang yang ada disekitar Stadion Gelora Bung Tomo Surabaya. Tujuan penyusunan laporan tugas akhir ini adalah merencanakan gedung parkir yang memadahi untuk para pendukung persebaya.
Perencanaan ini diawali dengan pengumpulan data serta survey langsung ke lapangan. Data yang dibutuhkan untuk perencanaan ini adalah data primer dan data sekunder yang terdiri dari peta lokasi, topografi wilayah sekitar lokasi. Perhitungan pertama yang dilakukan dalam perencanaan ini adalah melakukan analisa dari hasil survey lapangan berupa volume kendaraan (counting) dalam hal ini adalah kendaraan yang datang pada saat ada pertandingan sepak bola di stadion Gelora Bung Tomo dan dilakukan wawancara untuk mengetahui berapa permintaan parkir. Dari analisa ini, dapat diperoleh volume kendaraan, nilai forecasting (peramalan), dan juga karakteristik pengguna parkir. Tahap perencanaan, perencanaan beberapa layout rencana ruang parkir termasuk sirkulasi kendaraan dan tata cara untuk parkir. Meramalkan permintaan ruang parkir untuk 5 tahun kedepan.
Dari hasil analisis menggunakan stated preference, didapatkan persentase probabilitas orang yang akan menggunakan fasilitas gedung parkir adalah 74% pengendara mobil dan 57% pengendara sepeda motor. Karakteristik pengguna mobil paling banyak didapatkan pada pria, 21-40 tahun, dengan tujuan menonton bola, durasi 4-5 jam, dan belum pernah menggunakan angkutan umum. Pada pengguna sepeda motor juga didapatkan hal yang serupa.
Pada Tugas Akhir ini penulis mengharapkan nantinya dapat diketahui dan didapatkan permintaan kebutuhan ruang parkir selama 5 tahun, dan juga akan di dapatkan layout pola parkir yang tepat.
====================================================================================================
Surabaya is the capital of East Java province, Indonesia which is the second largest city in Indonesia after Jakarta. With a population of nearly 3 million people as a metropolitan city, Surabaya became the center of economic activity in East Java and surrounding areas. Besides being well known as a trading and industrial city, Surabaya is also known as a city that produces outstanding athletes. Surabaya has a football stadium that is Gelora Bung Tomo Stadium or often called GBT located at Jalan Benowo Surabaya, East Java. Having a soccer team known as "persebaya" that is famous and good, persebaya also have extraordinary supporters, namely "BONEK". Loyal supporters of the Surabaya soccer team always come and support when "persebaya" play, it demands the Gelora Bung Tomo Surabaya Stadium to have several facilities, such as a parking lot. Unfortunately, Gelora Bung Tomo Stadium does not have such facilities and visitors are forced to park on the streets and in the warehouses that are around Gelora Bung Tomo Stadium Surabaya. The purpose of the preparation of this final report is to plan a parking lot for the persebaya supporters.
This planning begins with data collection and direct survey to the field. The data needed for this planning are primary data and secondary data consisting of location map, topographic area around the location. The first calculation carried out in this plan is to analyze the results of field surveys in the form of vehicle volume (counting) in this case is the vehicle that comes when there is a football match at the Gelora Bung Tomo stadium and conducted an interview to find out how much parking demand. From this analysis, the data that are obtained are vehicle volume, forecasting value (forecasting), and also the characteristics of parking users. Planning phase, planning multiple layout plan of parking spaces including vehicle circulation and procedure for parking. Forecast the demand for parking spaces for the next 5 years.
From the analysis results using the stated preference, obtained percentage probability of people who will use the parking building facilities is 74% of motorists and 57% of motorcyclists. Characteristics of car users most often found in men, 21-40 years, with the goal of watching the ball, the duration of 4-5 hours, and has never used public transportation. In motorcycle users also obtained a similar thing.
In this Final Project the author expects to know and obtain the demand of parking space for 5 years, also to get the layout of the right parking pattern.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: on street parking, parking street, level of saturation, forecasting
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
T Technology > TE Highway engineering. Roads and pavements > TE7 Transportation--Planning
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses
Depositing User: Ario Putra Darmawan
Date Deposited: 05 Aug 2021 22:02
Last Modified: 05 Aug 2021 22:07
URI: http://repository.its.ac.id/id/eprint/57055

Actions (login required)

View Item View Item