Alternatif Perencanaan Perbaikan Tanah Dasar dan Perkuatan Dinding Pada Konstruksi Underpass Lori STA 30+658 (Studi Kasus Proyek Tol Gempol-Pasuruan)

Putra, Aditya Winahyo Eka (2018) Alternatif Perencanaan Perbaikan Tanah Dasar dan Perkuatan Dinding Pada Konstruksi Underpass Lori STA 30+658 (Studi Kasus Proyek Tol Gempol-Pasuruan). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111645000058-Undergraduate_theses.pdf]
Preview
Text
03111645000058-Undergraduate_theses.pdf - Accepted Version

Download (6MB) | Preview

Abstract

Proyek konstruksi tol Gempol-Pasuruan merupakan proyek
jalan tol yang menghubungkan antara wilayah Gempol dan
Pasuruan. Proyek yang akan ditinjau merupakan pembangunan
seksi 3 yang menghubungkan Grati hingga Pasuruan. Pada sekitar
lokasi proyek tol tersebut banyak ditemukan industri tebu. Adanya
jalan untuk kereta industri tebu yang memotong timbunan jalan tol
maka konstruksi underpass perlu dibangun agar kereta tebu dapat
melintasi konstruksi timbunan jalan tol tanpa harus berjalan
memutar.
Permasalahan yang umumnya terjadi pada pembangunan
kontruksi underpass adalah pemampatan tanah dasar akibat
beban lateral dan tekanan tanah pada dinding underpass.
Lamanya waktu pemampatan yang terjadi dan pemampatan yang
besar merupakan permasalahan yang harus ditanggulangi agar
konstruksi tidak mengalami kerusakan. Besarnya tekanan tanah
terhadap konstruksi underpass yang berada didalam tanah juga
perlu diperhitungkan sehingga diperlukan konstruksi perkuatan
dinding untuk penahan tanah.
Perkuatan untuk dinding penahan tanah akan digunakan
dua alternatif, yaitu geotextile-wall dengan box tunnel dan
reinforced-geogrid wall dengan bridge structure. Sedangkan untuk
mengatasi masalah lamanya waktu pemampatan dan besar
ii
pemampatan yang terjadi maka akan digunakan metode perbaikan
tanah dasar Pre-loading dan metode perbaikan tanah dasar
menggunakan PVD (pre fabricated vertical drain).
Hasil dari perencanaan dapat diketahui bahwa alternatif
box tunnel dengan perbaikan tanah dasar menggunakan metode
preloading dan pvd serta perkuatan dinding dengan metode
geotextile-wall merupakan pilihan alternatif yang paling efisien
dari segi biaya dan efisien dalam hal kebutuhan material.
================================================================== Construction project of Gempol-Pasuruan toll road is a toll
road project that connecting between Gempol and Pasuruan area.
The project that will be reviewed is the construction of section 3
that connects Grati to Pasuruan city. At about the project location
mostly found the sugar cane industry. The existance of the sugar
cane industrial path that cut the embankment of the toll road so the
underpass construction needs to be built the the sugar cane
industrial train can be able to cross the embankment without
turning around.
The general problem that occur in underpass construction
are about the settlement cause by the lateral load and soil pressure
on the underpass wall. The time length of settlement that happen
and a big settlement are the problem that must be repaired in order
to prevent construction from damaged.. the magnitude of soil
pressure againts underpass construction that located in the ground
need to be calculated so it required construction method of
retaining wall for ground anchoring.
Two alternatives will be use for retaining wall, geotextilewall
with box tunnel and reinforced-geogrid wall with bridge
structure. Otherwise, to overcome the problem about the time
length of settlement and the magnitude of the settlement that
iv
happen it will be used ground improvement method with
preloading and pre fabricated vertical drain (PVD).
The result of the planning can be known that box tunnel
alternative with preloading and pvd method for soil improvement
as well as retaining wall with geotextile-wall method is the most
efficient alternative option in terms of cost and the most efficient in
terms of material needs.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Underpass , preloading , PVD , Geotextile , Reinforced-wall
Subjects: B Philosophy. Psychology. Religion > B Philosophy (General)
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA749 Soil stabilization
T Technology > TA Engineering (General). Civil engineering (General) > TA775 Foundations.
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses
Depositing User: Aditya Winahyo Eka putra
Date Deposited: 09 Jul 2021 10:35
Last Modified: 09 Jul 2021 10:35
URI: http://repository.its.ac.id/id/eprint/57256