Abstract

Perumahan Sentraland terletak di Kota Baru Driyorejo, Gresik. Pada saat Tugas Akhir ini dibuat, Perumahan Sentraland Driyorejo ini masih pada tahap pembanguna sampai sekarang, sehingga diperlukan perencanaan sistem drainase yang sesuai dengan kondisi pada perumahan, agar air limpasan hujan pada area perumahan dapat segera dialirkan dan tidak menyebabkan genangan. Pada Tugas Akhir ini sistem drainase direncanakan dengan 3 outlet yang bermuara pada kolam eksisting yang berada di area perumahan.
Metode yang digunakan dalam mengerjakan Tugas Akhir ini adalah sebagai berikut. Pertama, penentuan stasiun hujan yang berpengaruh terhadap lokasi studi dengan metode Poligon Thiessen. Kedua, penentuan hujan harian rata-rata berdasarkan tinggi hujan harian maksimum dari data curah hujan tahun 2006-2015. Ketiga, analisa distribusi untuk mendapatkan curah hujan rencana untuk periode ulang hujan 2 tahun untuk saluran tersier dan 5 tahun untuk saluran primer. Keempat, analisa dimensi saluran berdasarkan curah hujan rencana dan waktu konsentrasi. Kelima, penentuan kapasitas kolam tampungan berdasarkan debit, dan waktu konsentrasi.
Dari keseluruhan analisa didapatkan hasil sebagai berikut ini. Pertama, didapatkan 3 stasiun hujan yang berpengaruh terhadap lokasi studi, yaitu stasiun hujan Menganti, Kandangan, dan Ketegen. Kedua, analisa distribusi yang digunakan adalah distribusi Gumbell. Ketiga, didapatkan curah hujan rencana untuk periode ulang 2 tahun adalah 87,47 mm dan untuk periode ulang 5 tahun adalah 113,76 mm. Keempat, didapatkan dimensi saluran primer untuk Outlet A sebesar 70x80cm, saluran primer untuk Outlet B sebesar 70x70cm, dan saluran primer untuk Outlet C sebesar 70x80cm. Kelima, kolam tampung eksisting berupa waduk, memiliki kapasitas volume inflow maksimum 50.030,34 m3. Sedangkan volume inflow total yang masuk ke kolam tampung adalah sebesar 2903,856 m3. Maka kolam tampung masih mampu untuk menampung debit limpasan. Dengan demikian sistem drainase pada Perumahan Sentraland dapat berfungsi dengan baik dan tidak menyebabkan genangan pada area perumahan.
=======================================================================================================
Sentraland Regency is located at Kota Baru, Driyorejo, Gresik. When this Final Project was started, the Sentraland Regency is still under construction until now, so the drainage planning of the area is necessarily needed, so the discharge from the rain can be quickly accommodated and not causing any flood in the residence area. The drainage planning in this Final Project is planned with 3 outlets which are flowing towards existing reservoir that is located in the residence area.
The methods which is used in this Final Project as follows. First, determine the rain station that will affect the residence area with Polygon Thiessen methods. Secondly, determine the average daily rain based on the maximum daily rain from the daily rain data from the years 2006-2015. Third, the distribution analysis from the daily rain data to obtain rainfall plan for frequencies of occurrence are once in 2 years for tertiary channel and secondary channel, and 5 years for prime channel. Fourth, channel size analysis based on rainfall plan and time of concentration. Fifth, determine the reservoir capacity based on the discharge and time of concentration.
From the overall analysis, the results is as follows. First, obtained 3 rain station that is affecting the residence area. Second, the distribution analysis is using Gumbell Methods. Third, obtained the rainfall plan for frequencies of occurrence are once in 2 years is 87.47 mm and for 5 years is 113.76 mm. Fourth, the size of prime channel from Outlet A is 70x80cm, size of prime channel from Outlet B is 70x70x120cm, and size of prime channel from Outlet C is 70x80cm.. Fifth, the existing reservoir had the maximum inflow volume of 50,030.34 m3, which is still can be used to accommodate the discharge from the residence area with the inflow volume is 2903.856 m3. With all these data, the drainage system of Sentraland Regency will not caused any floods in the residence area.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: floods, drainage, reservoir, channel, Sentraland, Driyorejo, Gresik
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE215 Drainage
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses
Depositing User: Agung Widi Prasetyo
Date Deposited: 02 Aug 2021 21:54
Last Modified: 02 Aug 2021 21:54
URI: http://repository.its.ac.id/id/eprint/57815

Actions (login required)

View Item View Item