Rochmansyah, Wahyu (2018) Outage Management Dan House Of Quality Untuk Memperbaiki Kinerja Pembangkit Listrik. Masters thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
09211650015038 - Master_Thesis.pdf - Accepted Version Download (11MB) | Preview |
Abstract
Pembangkit Coal Power Plant dari Fast Tracking Project (FTP) yang dipunyai oleh
PT ABC dibangun oleh kontraktor dari China. PT ABC merupakan perusahaan yang
bergerak di bidang bisnis pelayanan jasa penyediaan tenaga listrik. Pada tahun 2010
PT ABC mendirikan unit bisnis baru yang khusus melayani pelaksanaan Operation &
Maintenance unit pembangkitan yakni Unit Bisnis Jasa Operation & Maintenance.
Saat ini telah melaksanakan Operation & Maintenance empat unit pembangkit skala
besar yaitu : PLTU Indramayu, PLTU Rembang, PLTU Pacitan dan PLTU Paiton Baru,
Kondisi peralatan pembangkit rata-rata kurang baik. Pemeliharaan yang dilaksanakan
saat ini kurang memadai lagi meskipun dengan kondisi usia peralatan yang masih
muda. Pengelolaan Pemeliharaan Pembangkit Listrik diperlukan agar pembangkit
listrik tersebut mampu meningkatkan mutu pelayanan dalam rangka memenuhi
tuntunan masyarakat dan tantangan perkembangan teknologi, Untuk memperbaiki
perencanaan dan kesiapan overhaul pada tingkat yang optimal perlu dibuat pengelolaan
manajemen pemeliharaan mengunakan Outage Management, yang merupakan proses
sinergi dan berkesinambungan dari Perencanaan, Monitoring, Pengendalian serta
Evaluasi Planed Outage dan menggunakan House of Quality (HOQ), yang secara garis
besar Voice Of Costumer diupayakan dikonversi secara langsung keandalan
Karakteristik teknis pemeliharaan. Dengan menerapkan hal tersebut yang dilakukan
penelitian di PLTU Indramayu proses setelah pelaksanaan overhaul terdapat kenaikan
pada effisiensi boiler 86.3 % menjadi 86.4 % dan penurunan nilai Heat Rate turbin
2133 menjadi 2089 Kcal/Kwh, Pada House of Quality (HOQ) terdapat hubungan
Korelasi antara sesama Technical Requerement Rangking Respon Teknikal 3 tertinggi
adalah Safety Base Outage Management nomer 1 senilai 97, Customer Requirement
nomer 2 senilai 81 dan web outage management senilai 72 sehingga diharapkan
perusahaan bisa dapat mencapai karakteristik teknis yang sesuai dengan target yang
telah ditetapkan.
==================================================================================================================
The Coal Power Plant from Fast Tracking Project (FTP) owned by PT ABC is built by
contractors from China. PT ABC is a company working in the area of the provision of
electricity services business . In 2010 pt abc establish business units new special
serving the implementation of the operation & maintenance unit whenever the business
units services operation & maintenance . Currently has been implement operation &
maintenance four units of steam power plants a large scale with, namely Coal Fired
Power Plant Indramayu , Coal-Fired Power Plant Rembang , Coal Fired Power Plant
Pacitan And Paiton New Coal Fired Power Plant, The condition of generating
equipment is not good enough. Maintenance undertaken is currently inadequate again
despite the condition of the equipment age is still young. The maintenance of the power
plant is needed so that the power plant can improve the quality of service in order to
meet the community's guidance and the challenges of technological development. To
improve overhaul planning and preparedness at an optimum level, maintenance
management is required using Outage Management, which is a synergy and sustainable
process of Planning, Monitoring, Controlling and Evaluation Planed Outage and using
House of Quality (HOQ), which outline the voice of costumer attempted to be directly
converted reliability Technical characteristics of maintenance. By applying the
research done in PLTU Indramayu process after the implementation of overhaul there
is an increase in boiler efficiency 86.3% to 86.4% and decrease of turbine heat rate
value 2133 to 2089 Kcal / Kwh, At the House of Quality (HOQ there is a Correlation
relationship between the highest Technical Requerement Technical Response Rank 3
is safety base Outage Management number 1 worth 97, customer requirement number
2 is 81 and 72 web outage management is valued so that the company is expected to
achieve the appropriate technical characteristics with a set target
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RTMT 621.319 Roc o |
Uncontrolled Keywords: | Outage management, HOQ, Pemerliharaan, Pembangkit listrik, Voice Of Customer |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants |
Divisions: | Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis |
Depositing User: | Wahyu Rochmansyah |
Date Deposited: | 03 Nov 2020 03:55 |
Last Modified: | 03 Nov 2020 03:55 |
URI: | http://repository.its.ac.id/id/eprint/59275 |
Actions (login required)
View Item |