Analisa Interval Waktu Penggantian Pencegahan Komponen Kritis Excavator Komatsu PC1250-8R Untuk Meminimasi Breakdowntime di PT XYZ

Rachman, Rony Affandi (2018) Analisa Interval Waktu Penggantian Pencegahan Komponen Kritis Excavator Komatsu PC1250-8R Untuk Meminimasi Breakdowntime di PT XYZ. Masters thesis, Institut Teknologi Sepuluh November Surabaya.

[thumbnail of 09211450015005-Master_Thesis.pdf]
Preview
Text
09211450015005-Master_Thesis.pdf - Accepted Version

Download (4MB) | Preview

Abstract

Sistem pemeliharaan dan perawatan yang benar berpengaruh terhadap kelancaran operasional perusahaan. Pada tambang batubara terbuka, kondisi cuaca sangat mempengaruhi ketersediaan waktu untuk melakukan kegiatan penambangan. Perusahaan tambang dituntut untuk bisa mengoptimalkan waktu yang tersedia. Untuk itu, diperlukan peralatan yang mempunyai tingkat availabilitas yang tinggi. Beberapa pemilik tambang, memilih opsi untuk menyewa alat berat kepada perusahaan persewaan alat berat yang dirasa lebih mampu untuk menyediakan peralatan alat berat dengan availability yang tinggi. PT XYZ, sebuah perusahaan persewaan alat berat, mendapatkan kontrak sewa alat berat berupa empat buah Excavator Komatsu PC1250-8R dengan sebuah tambang batubara terbuka di Kalimantan Selatan. Untuk bisa memenuhi target ketersediaan alat berat yang dibebankan pemilik tambang, PT XYZ harus menerapkan strategi pemeliharaan dan perawatan yang tepat. Availability excavator yang tinggi dapat diraih dengan cara meminimasi downtime yang terjadi. Disamping itu, sejak tahun 2012 terjadi penurunan harga batubara yang berimbas terhadap harga sewa alat berat yang mengalami penurunan. Sehingga, selain harus bisa mngurangi downtime yang terjadi PT XYZ dituntut juga harus dapat meminimasi biaya pemeliharaan dan perawatan untuk bisa survive. Agar minimasi downtime excavator memiliki dampak yang cukup besar, maka harus ditentukan komponen kritis mana yang mempunyai pengaruh paling terhadap donwtime peralatan. Setelah diketahui komponen kritis, maka akan dicari juga interval penggantian pencegahan optimum untuk mendapatkan downtime yang minimal. Berdasarkan hasilpenelitianinididapat komponen kritis Excavator Komatsu PC1250-8R adalah Tooth Adapter , Seal Kit Stick Cylinder , Track Adjuster danWater Pump. Sedangkan Interval penggantian komponen optimum tooth adapter adalah 3832 jam, komponen seal kit stick cylinder adalah 3698 jam, komponen track adjuster adalah 6338 jam dan komponen water pump adalah 3999 jam.
==================================================================================================================
A proper maintenance and maintenance system affects operation of the
company. In open coal mines, weather conditions greatly affect the time available
for mining activities. Mining companies are required to optimize available time.
Therefore, equipment that has a high degree of availability is required. Some mine
owners choose the option to lease heavy equipment from heavy equipment rental
companies that are more able to provide heavy equipment with high availability.
PT XYZ, a heavy equipment rental company, obtained a heavy equipment rental
contract in the form of four Komatsu PC1250-8R Excavators with an open coal
mine in South Kalimantan. To meet the heavy equipment availability target of the
mine owner, PT XYZ must implement appropriate maintenance and maintenance
strategies. A high availability excavator can be obtained by minimizing downtime.
However, since 2012 there has been a decline in coal prices that impact on the
rental price of heavy equipment that has decreased. Thus, in addition to reducing
downtime, PT XYZ is also required to be able to minimize maintenance costs to
survive. To minimize downtime of the excavator having a considerable impact,
company must determined the critical components having the most influence on
equipment donwtime. After the critical component is known, it will also look for
optimum prevention replacement interval to get minimal downtime. Based on the
results of this study, Komatsu Excavator PC1250-8R critical components are
Tooth Adapter, Stick Cylinder Seal Kit, Track Adjuster and Water Pump. The
optimum component replacement interval of tooth adapter is 3832 hours, cylinder
stick seal kit component is 3698 hours, track adjuster component is 6338 hours
and water pump component is 3999 hours

Item Type: Thesis (Masters)
Additional Information: RTMT 620.004 6 Rac a
Uncontrolled Keywords: preventive replacement, reliability, availability, minimasi downtime
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA169 Reliability (Engineering)
Divisions: Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis
Depositing User: Rachman Rony Affandi
Date Deposited: 03 Nov 2020 03:38
Last Modified: 03 Nov 2020 03:38
URI: http://repository.its.ac.id/id/eprint/59283

Actions (login required)

View Item View Item