Analisa Resiko Teknis Yang Mempengaruhi Kinerja Waktu Proyek Pembangunan Pengaman Pantai Di Provinsi Sulawesi Barat

-, Anwar (2015) Analisa Resiko Teknis Yang Mempengaruhi Kinerja Waktu Proyek Pembangunan Pengaman Pantai Di Provinsi Sulawesi Barat. Masters thesis, Institut Technology Sepuluh Nopember.

[thumbnail of 9112202806-Master Thesis.pdf]
Preview
Text
9112202806-Master Thesis.pdf - Published Version

Download (1MB) | Preview

Abstract

Proyek pembangunan pengaman pantai di Provinsi Sulawesi Barat
merupakan proyek pembangunan yang memiliki resiko cukup tinggi, seperti
kondisi pasang surut, hantaman gelombang dan sebagainya, sehingga
dikhawatirkan dapat menghambat pelaksanaan proyek. Penelitian ini bertujuan
untuk mengidentifikasi dan analisa resiko yang timbul dalam pelaksanaan proyek
pembangunan pengaman pantai di Provinsi Sulawesi Barat.
Lokasi penelitian ini di proyek pembangunan pengaman pantai Provinsi
Sulawesi Barat. Variabel resiko didapat dari literatur dan akan di validasi oleh
metodologi dan alur penelitian. Responden penelitian ini adalah Project Manager
proyek-proyek bangunan pantai di Provinsi Sulawesi Barat. Teknik sampling yang
digunakan adalah non-probability sampling (purposive sampling) dan resiko akan
dianalisa menggunakan probability impact matrix.
Hasil akhir penelitian menunjukkan bawah pada proyek pembangunan
bangunan pengaman pantai di Sulawesi Barat terdapat 3 resiko dengan kategori
tinggi yaitu : Resiko kerusakan alat, keterlambatan pengadaan material dan
peralatan dan resiko ketidaksesuaian hasil pelaksanaan dengan spesifikasi.
Adapun untuk meminimasi resiko digunakan metode Risk Reduction
(pengurangan resiko).
=====================================================================================================
Construction of coastal protection projects in the province of West Sulawesi
is a project development risk is high enough, such as tidal conditions, blow wave
and so on, so it is feared could hamper the implementation of the project. This
study aims to identify and analyze risks that arise in the implementation of
development projects of coastal protection in the province of West Sulawesi.
The location of this research in the construction of coastal protection West
Sulawesi province. Risk variables obtained from the literature and will be
validated by the research methodology and flow. The respondents of this study is
the Project Manager of building projects in the province of West Sulawesi coast.
The sampling technique used is a non-probability sampling (purposive sampling)
and risks will be analyzed using a probability-impact matrix.
The final results showed that under the protection structure development
projects in West Sulawesi there are three high-risk category, namely: Risk of
equipment damage, delays in the procurement of materials and equipment and the
risk of incompatibility with the results of the implementation of the specification.
The method is used to minimize the risk of Risk Reduction (risk reduction).

Item Type: Thesis (Masters)
Additional Information: RTMT 658.155 Anw a
Uncontrolled Keywords: Analisa resiko, pengaman pantai.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: 61101-Magister Management Technology
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 10 Oct 2018 08:27
Last Modified: 10 Oct 2018 08:27
URI: http://repository.its.ac.id/id/eprint/59848

Actions (login required)

View Item View Item