PT. PJB UP Gresik adalah salah satu perusahaan jasa
dibidang produksi tenaga listrik yang berada di kawasan industri
Gresik, untuk kemudian disalurkan ke sistem interkoneksi Jawa-
Bali. Jumlah Daya listrik yang dihasilkan oleh perusahaan ini
sebesar 2.260 Mega Watt (MW) yang terdiri dari dua unit
pembangkit listrik tenaga gas, empat unit pembangkit listrik
tenaga uap, dan tiga blok unit pembangkit listrik tenaga gas dan
uap. PT. PJB UP Gresik sendiri mempunyai peralatan-peralatan
pendukung beroperasinya turbin uap yang berputar dan
berhubungan dengan generator. Diantara pendukungnya adalah
kondensor. Kondensor adalah salah satu jenis pesawat penukar
kalor yang berfungsi mengkondensasikan uap bekas dari turbin,
yaitu air laut. Jenis kondensor yang digunakan pada PLTU Unit
IV PT. PJB UP Gresik adalah surface condenser. PLTU Unit IV
PT. PJB UP Gresik memiliki kapasitas 200 MW dengan tekanan
vakum pada kondensor sebesar 695 mmHg.
Pada tugas akhir ini, mencakup proses perhitungan
dilakukan dengan menggunakan analisa perpindahan panas
dengan metode Log Mean Temperature Different (LMTD) dan
NTU-Effectiveness di kondensor Unit IV PLTU . Dalam
perhitungan, memvariasikan beberapa hal yang berpengaruh
pada efektifitas kondensor ini. Analisa perpindahan panas dan
effectiveness digunakan untuk mengetahui kerja kondensor unit
IV pada tanggal 9 Juni 2014 sampai tanggal 11 Juni 2014.
Diambil sampling data pada saat performance test kondensor
pada beberapa hari yang disebutkan dan dengan data aktual
v
beban, kevakuman kondensor, suhu (temperatur) masuk dan
keluar steam, suhu (temperatur) masuk dan keluar air laut yang
saling mendekati; kemudian direrata.
Hasil yang didapat dari tugas akhir ini adalah nilai laju
perpindahan panas dan effectiveness (ε) kondensor unit IV dari
tanggal 9 Juni 2014 sampai 11 Juni 2014. Pada kondensor unit
IV, ditanggal 9 Juni 2014 sampai tanggal 10 Juni 2014 diperoleh
laju perpindahan panas sebesar 153.6001264 MW. Ditanggal 10
Juni 2014 sampai tanggal 11 Juni 2014 diperoleh laju
perpindahan panas sebesar 131.9188202 MW. Sedangkan
effectiveness (ε), ditanggal 9 Juni 2014 sampai 10 Juni 2014
diperoleh 0.99571 % dan ditanggal 10 Juni 2014 sampai 11 Juni
2014 didapat 0.99661 %. Hal ini menunjukkan bahwa keadaan
kondensor cukup baik, dikarenakan steam dapat menuju
kondensor, sehingga laju perpindahan panas dan effektifitas
kondensor mampu mengkondensasi steam menjadi cair.
=======================================================================================================
PT. PJB UP Gresik is one service company in the
production of electric power at industrial area of Gresik, for
distributed to the Java-Bali with interconnection system.
Electrical power amount generated by these companies amounted
to 2.260 Mega Watt (MW) consisting of two gas-fired power
generation units, four units of the steam power plant, and three
blocks of power plants and steam gas. PT. PJB UP Gresik alone
has the equipment supporting the operation of the steam turbine
that rotates and is associated with the generator. Among its
supporter are condensers. The condenser is one of the best types
of heat exchanger that functions of the former steam condensing
turbine, is seawater. Condenser type used in the power plant Unit
IV PT. PJB UP Gresik is a surface condenser. Power Plant Unit
IV PT. PJB UP Gresik has a capacity of 200 MW with the
condenser vacuum pressure of 695 mmHg.
In this thesis, includes the calculation process is done by
using a heat transfer analysis method Different Log Mean
Temperature (LMTD) and NTU-Effectiveness in Unit IV power
plant condenser. In the calculation, varying some of the things
that influence the effectiveness of this condenser and heat transfer
analysis used to determine the effectiveness of work condenser
unit IV on June 9, 2014 until June 11, 2014. Taken sampling data
during the performance test condenser on some days indicated
and the actual data load, the vacuum condenser, the temperature
of incoming and outgoing temperature steam, the temperature of
incoming and outgoing temperature of the sea water approach
each other; then average it.
The results of this thesis is the value of heat transfer rate
and effectiveness (ε) condenser unit IV of the date of June 9, 2014
until June 11, 2014. At condenser unit IV, the date of June 9,
2014 until the date of June 10, 2014 obtained the heat transfer
rate of 153.6001264 MW. The date of June 10, 2014 until the date
of June 11, 2014 obtained the heat transfer rate of 131.9188202
MW. While the effectiveness (ε), the date June 9, 2014 until June
10, 2014 was obtained 0.99571% and the date of June 10, 2014
until June 11, 2014 0.99661% obtained. This shows that the state
of the condenser is good enough, because the steam can head
condenser, so the heat transfer rate and effectiveness steam
condenser capable of condensing into liquid.

Item Type: Thesis (Diploma)
Additional Information: RSM 621.402 2 Fau a
Uncontrolled Keywords: Kondensor, Laju Perpindahan Panas, Effektifitas
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ263 Heat exchangers
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21401-(D3) Diploma 3
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 19 Dec 2018 03:23
Last Modified: 19 Dec 2018 03:23
URI: http://repository.its.ac.id/id/eprint/60100

Actions (login required)

View Item View Item