Uji Coba Implementasi Waktu Standar Dalam Pengelolaan Aktivitas Satgas Pertamanan Dkp Surabaya = Standard Time Implementation Trial In Managing The Park’s Worker Of Dkp Surabaya

Zakiyyah, Nuriy Zulfah (2016) Uji Coba Implementasi Waktu Standar Dalam Pengelolaan Aktivitas Satgas Pertamanan Dkp Surabaya = Standard Time Implementation Trial In Managing The Park’s Worker Of Dkp Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
2512100062-Undergraduate_Theses.pdf - Published Version

Download (3MB)

Abstract

Surabaya merupakan kota dengan penduduk terbesar nomor dua di Negara Indonesia, dan jumlahnya diperkirakan akan terus meningkat setiap tahunnya. Peningkatan jumlah penduduk tentunya diiringi dengan peningkatan jumlah kebutuhan oksigen, yang kemudian menuntut jumlah taman. Peningkatan jumlah taman berimbas pada peningkatan jumlah satgas yang harus dipekerjakan DKP Kota Surabaya selaku pengelola taman Kota Surabaya, dan peningkatan kebutuhan satgas akan berdampak pada pengeluaran DKP Kota Surabaya. Agar pengeluaran DKP Kota Surabaya dapat efektif, maka perlu dilakukan pengoptimalan kinerja satgas. Pada tahun 2015, telah dilakukan penelitian oleh Kamil (2015) dan Rydley (2015) mengenai waktu standar sebagai dasar untuk mengoptimalkan kinerja satgas, namun belum ada mekanisme penerapan waktu standar serta pemberian tugas kepada satgas pertamanan melalui sebuah sistem yang baku. Penelitian ini bertujuan untuk membuat sistem dapat membantu penerapan waktu standar. Proses penelitian dimulai dengan pengumpulan data kondisi terkini, kemudian perandangan dan pengimplementasian sistem. Hasil implementasi kemudian dianalisa untuk membuat perbaikan sistem. Sistem yang dibuat merupakan terdiri atas sistem informasi dan SOP penerapan. Input untuk sistem informasi adalah data penugasan yang terdiri atas data instruksi, kode area instruksi, persentase area instruksi serta nama satgas yang diberi instruksi sedangkan outputnya adalah penugasan satgas dan rekap tugas. Penugasan satgas yang akan diketahui berupa rekap tugas satgas yaitu data instruksi, luas area instruksi, serta estimasi waktu pengerjaan, sementara rekap tugas yang diketahui terdiri atas data instruksi, kode area dan luas area. Melalui penelitian ini, diketahui bahwa pembuatan sistem membutuhkan data lain selain waktu standar antara lain data pembagian area dan luasnya pada setiap taman serta daftar aktivitas pada taman tersebut. Beberapa hal yang penting untuk diperhatikan dalam pelaksanaan sistem adalah pemberian penugasan yang jelas dari koordinator, partisipasi dari satgas, koordinator serta Kepala UPTD Taman Flora, serta pembaruan sistem bila ada perubahan. ========== Surabaya is the second city with largest population in Indonesia and still predicted to growth annually. The population growth leads to increase of oxygen needed. One of the ways to fulfill the oxygen needs is by creating some parks however, creating more parks will cause more expenditure for DKP Kota Surabaya. In order to not waste the expenditure, DKP Kota Surabaya needs to optimize the performance of their park worker. In 2015, some researches has been conducted by Kamil (2015) and Rydley (2015) to discover standard time for activity of park’s worker to optimize their performance, however, due to no mechanism and standard for duty provision, the standard time has not been used. This research is conducted to create a system to implement the standard time. The research is started with data collection of current condition then continued with system design and implementation. The implementation’s results then being analyzed to create improvement to the system. System that made consists of information system and SOP. Input for the information system is assignment data which consists of instruction data, area code data, area percentage data and name of park worker that given the instruction, while the outputs are park worker assignment and recap of assignment. The park worker assignment that can be known through the system consists of instruction data, wide of instruction area, and working time estimation while recap of assignment consists of instruction data, area code and wide. Based on this research, there are other data that needed to build the system beside standard time, they are area partition and wide for every park, and list of activity on every park. Several importance things that needed to be noted are clear duty distribution from coordinator, participation from park’s worker, coordinator and head of UPTD Taman Flora, and also system update if there is an important change.

Item Type: Thesis (Undergraduate)
Additional Information: RSI 658.542 1 Zak u-1
Uncontrolled Keywords: DKP Kota Surabaya, Satgas Pertamanan, Sistem, Work Sampling, Park Worker, System, Work Sampling
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling
T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Industrial Technology > Industrial Engineering > (S1) Undergraduate Theses
Depositing User: - Davi Wah
Date Deposited: 11 Jan 2019 07:43
Last Modified: 11 Jan 2019 08:04
URI: http://repository.its.ac.id/id/eprint/60161

Actions (login required)

View Item View Item