Evaluasi Implementasi SAP di Perusahaan Engineer-To-Order: Studi Kasus PT Industri Kereta Api (Persero)

Satyawati, Putu Cyndi Ariesta (2019) Evaluasi Implementasi SAP di Perusahaan Engineer-To-Order: Studi Kasus PT Industri Kereta Api (Persero). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 05211540000131_Undergraduate_Theses.pdf]
Preview
Text
05211540000131_Undergraduate_Theses.pdf

Download (4MB) | Preview

Abstract

PT Industri Kereta Api (Persero) atau PT INKA telah mengimplementasikan SAP pertama kali pada tahun 2011 dan mulai sepenuhnya mengunakan SAP sejak tahun 2016 bersama dengan PT Telkom Indonesia. PT Industri Kereta Api (Persero) atau PT INKA adalah salah satu perusahaan jenis engineer-to-order karena PT INKA memiliki proyek pembuatan kereta yang ditujukan untuk pelanggan BUMN yang disesuaikan dengan kebutuhan pelanggannya. Proyek-proyek yang ditangani oleh perusahaan engineer-to-order terkadang memiliki risiko keterlambatan pada aktivitas tertentu dikarenakan banyak faktor terkait misalnya pada proses perancangan maupun produksi. Perusahaan jenis ETO memiliki perencanaan dan penetapan tanggal jatuh tempo terutama untuk proyek-proyek besar, sehingga menyebabkan perencanaan waktu merupakan hal yang penting. PT INKA (Persero) juga memiliki beberapa perencanaan dalam proses pembuatan kereta untuk pelanggannya yang didukung oleh ERP SAP. Namun, pada kenyataannya implementasi SAP pada PT INKA tidak dilakukan integrasi secara menyeluruh. Implementasi SAP seharusnya dapat mempermudah perencanaan yang dilakukan oleh PT INKA (Persero), namun ternyata tetap masih menyebabkan perencanaan beberapa aktivitas tidak sesuai atau mengalami keterlambatan.
Oleh karena itu, tugas akhir ini akan melakukan evaluasi lebih mendalam mengenai implementasi SAP dalam mendukung dan memonitor proses pembuatan kereta untuk pelanggan BUMN yang dilakukan oleh PT INKA (Persero) dengan menggunakan metode process mining. Hasil akhir dari evaluasi implementasi SAP di PT INKA (Persero) ini adalah rekomendasi perbaikan terhadap proses pembuatan kereta di PT INKA (Persero) untuk pelanggan BUMN yang didukung oleh ERP SAP sebagai masukan untuk melakukan monitoring proses pembuatan kereta untuk pelanggan BUMN selanjutnya. ================================================================================================
PT Industri Kereta Api (Persero) or PT INKA has implemented SAP for the first time in 2011 and started fully using SAP since 2016 with PT Telkom Indonesia. PT Industri Kereta Api (Persero) or PT INKA is one of engineer-to-order company because PT INKA has a train manufacturing project for BUMN customers which is customed to its customer’s needs. Project which is handled by engineer-to-order companies sometimes have the risk of delays in certain activities due to many related factors, for example in the design and production process. ETO companies have planning and setting due dates especially for large projects, so planning of time is important. PT INKA (Persero) also has several plans in the process of train manufacturing for its customers that are supported by ERP SAP. However, the implementation of SAP in PT INKA was not fully integrated. SAP implementation should be able to facilitate the planning which is carried out by PT INKA (Persero), but it still causes planning for some activities to be inappropriate or experiencing some delays.
Therefore, this final project will conduct a deeper evaluation of the SAP implementation in supporting and monitoring the process of train manufacturing for BUMN customers which is carried out by PT INKA (Persero) using process mining methods. The final result of this evaluation is a recommendation to improve the process of train manufacturing at PT INKA (Persero) for BUMN customers which is supported by SAP ERP as an input for monitoring the next process of train manufacturing for BUMN customers.

Item Type: Thesis (Undergraduate)
Additional Information: RSSI 658.401 2 Sat e-1 2019
Uncontrolled Keywords: Engineer-to-Order, ERP, SAP, Process Mining
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T57.5 Data Processing
T Technology > T Technology (General) > T58.6 Management information systems
T Technology > TS Manufactures > TS155 Production control. Production planning. Production management
T Technology > TS Manufactures > TS157.5 Production scheduling
Divisions: Faculty of Information and Communication Technology > Information Systems > 57201-(S1) Undergraduate Thesis
Depositing User: Putu Cyndi Ariesta Satyawati
Date Deposited: 30 Jun 2021 07:41
Last Modified: 30 Jun 2021 07:41
URI: http://repository.its.ac.id/id/eprint/60681

Actions (login required)

View Item View Item