Perencanaan Ulang Geometrik Interchange Waru Ramp Mojokerto – Sidoarjo

Herdiana, Alyssa Dewiputri (2019) Perencanaan Ulang Geometrik Interchange Waru Ramp Mojokerto – Sidoarjo. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111540000091-Undergraduate_Theses.pdf]
Preview
Text
03111540000091-Undergraduate_Theses.pdf

Download (16MB) | Preview

Abstract

Mojokerto dan Sidoarjo merupakan dua kabupaten yang tergabung dalam sebuah kawasan metropolitan di Provinsi Jawa Timur, yaitu Gerbangkertosusila (Gresik-Bangkalan-Mojokerto-Surabaya-Sidoarjo-Lamongan) yang bertujuan untuk mewujudkan pemerataan pembangunan antar daerah. Untuk mewujudkan tujuan tersebut diperlukan jalan tol yang dilengkapi akses keluar-masuk yang memadai dan tidak menyulitkan para pengendara. Dalam tugas akhir ini penulis mencoba merencanakan ulang interchange yang menghubungkan Mojokerto dan Sidoarjo di kawasan Waru yang sebelumnya pada akhir interchange dinilai berpotensi menyebabkan konflik lalu lintas atau weaving conflict karena pendeknya jarak dari ramp satu ke ramp yang lainnya. Perencanaan ulang ini meliputi desain geometri interchange dan ramp yang baru sehingga diharapkan akan mengurangi weaving conflict dan mengurangi potensi kemacetan yang mungkin terjadi. Dalam prosesnya, metodologi yang digunakan adalah dengan menganalisis pemilihan alternatif ramp dengan menggunakan metode Analytic Hierarchy Process kemudian merencanakan desain geometrik interchange dan ramp menggunakan Peraturan Bina Marga No.007/BM/2009. Perencanaan marka dan rambu lalu lintas berdasarkan Peraturan Menteri No. 13 tahun 2014 dan No. 34 tahun 2014. Dari hasil perencanaan geometrik yang dilakukan, dihasilkan 5 tikungan, yaitu 4 tikungan tipe S-C-S dan satu tikungan tipe S-S dengan jari-jari sebesar 200 m dan panjang lengkung peralihan sebesar 25,397 m. Sedangkan untuk perencanaan ramp dihasilkan ramp on dengan jari-jari sebesar 400 m tipe parallel dan ramp off dengan jari-jari sebesar 250 m tipe parallel. Rambu lalu lintas direncanakan terdapat 15 buah dan 3 macam marka.
===============================================================================================================================
Mojokerto and Sidoarjo are two districts incorporated in a metropolitan area in East Java Province, namely Gerbangkertosusila (Gresik-Bangkalan-Mojokerto-Surabaya-Sidoarjo-Lamongan) which aims to create equitable development between regions. To realize these objectives, toll roads are needed, which are equipped with adequate in and out access and do not make it difficult for drivers. In this final assignment, the writer tries to re-plan the interchange that connects Mojokerto and Sidoarjo in the Waru region, which at the end of the interchange was considered to have the potential to cause weaving conflict due to the short distance from ramp to the other ramp. This re-planning includes the design of the new interchange and ramp geometry so that it is expected to reduce weaving conflict and reduce potential congestion that may occur. In the process, the methodology used is by analyzing the choice of ramp alternatives using the Analytic Hierarchy Process method and then planning the geometric interchange and ramp designs based on Bina Marga Regulation No. 007/BM/2009. Planning of traffic mark and signs based on Ministerial Regulation no. 13 in 2014 and no. 34 in 2014. From the results of the geometric planning carried out, 5 bends were produced, namely 4 S-C-S type bends and one S-S type bend with a radius of 200 m and a transition arch length of 25,397 m. While for planning the ramp, it will be ramped with radius of 400 m parallel type and ramp off with radius of 250 m parallel type. Traffic signs are planned to have 15 pieces and 3 kinds of markers.

Item Type: Thesis (Other)
Uncontrolled Keywords: Simpangsusun, Jalan Akses, Tol Surabaya-Mojokerto, Tol Surabaya-Porong
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE175 Road and highway design
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Alyssa Dewiputri Herdiana
Date Deposited: 15 Jul 2024 01:14
Last Modified: 15 Jul 2024 01:14
URI: http://repository.its.ac.id/id/eprint/61182

Actions (login required)

View Item View Item