Analisa Risiko Proyek Pembangunan Di BPWS (Studi Kasus: Rest Area Sisi Barat di KKJSM Tahap III)

Perdana, Feby Diana Asia Mulia (2019) Analisa Risiko Proyek Pembangunan Di BPWS (Studi Kasus: Rest Area Sisi Barat di KKJSM Tahap III). Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211650014035-Master_Thesis.pdf] Text
09211650014035-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2022.

Download (3MB) | Request a copy

Abstract

Proyek pembangunan Rest Area Sisi Barat di KKJSM Tahap III merupakan proyek yang begitu penting bagi masyarakat Madura, wisatawan pendatang dan sekaligus penting untuk penataan dan pemberdayaan PKL di sekitar Kawasan Kaki Jembatan Suramadu Sisi Madura. Pembangunan Rest Area Sisi Barat ini di bangun oleh BPWS (Badan Pengembangan Wilayah Suramadu) yang di kerjakan oleh kontraktor PT. Nindya Karya (Persero). Beberapa kendala yang menghambat didalam proses pembangunan Rest Area ini yang mengakibatkan keterlambatan pada penyelesaian pekerjaan dari jangka waktu yang sudah disepakati didalam Surat Perjanjian Kerja. Maka dari itu perlunya manajemen risiko dalam proses pembangunan Rest Area ini dengan sisa target waktu yang ada dan penelitian ini dapat digunakan sebagai pembelajaran untuk proyek Rest Area tahap selanjutnya, dimana didalam penelitian ini bertujuan untuk mengidentifikasi risiko-risiko yang ada dan memitigasi risiko–risiko yang ada dengan menggunakan metode Focus Group Discussion (FGD) dan metode Failure Mode Effect Analysis (FMEA). Didapatkan hasil penelitian yaitu risiko yang dianggap kritis dan dominan terhadap biaya dan waktu. Risiko yang dianggap sangat tinggi dan dominan yaitu Kedatangan material terlambat dengan nilai Risk Priority Number (RPN) 661,6 penyelesaian pelaporan yang terlambat dengan nilai Risk Priority Number (RPN) 642.4, adanya masalah sosial dengan nilai Risk Priority Number (RPN) 604,8, tertahannya material yang masuk 592.2, dan adanya masalah pembebasan lahan dengan nilai Risk Priority Number (RPN) 541,8. Mitigasi dari risiko yang dinilai dominan / kritis yaitu lebih selektif dalam memilih sumberdaya, menambah pekerja, perlunya melakukan koordinasi dan negosiasi, perlunya pendampingan tim keamanan, dan disiplin dalam menerapkan manajemen waktu.
================================================================================================
Project development of the west side rest area at KKJSM Phase III is important for people in Madura island, both native and tourisms. The development is able to improve the economic and culture in Madura. The construction was built by BPWS (Suramadu Regional Development Agency) which was carried out by PT. Nindya Karya (Persero) as the contractor. However, during the process, several risks occurred and cause the project completion delay. Therefore, this research is trying to manage and mitigate risk in this construction project with the remaining time targets. This research involve some experts to identify existing and mitigate available risks by using the Focus Group Discussion (FGD). Moreover, the Failure Mode Effect Analysis (FMEA) methods used for assisting the potential failure identification by considering the critical and dominant variables. The results of this study indicate the delay in material fulfillment for 661.6 RPN, project report for 642.4 RPN, the existence of social problems for 604.8 RPN. From these results, the evaluation can be carried out by the contractor by increasing the stages of worker selection, time management, coordination, and supervision of project execution. Therefore, the project can be completed within a specified time.

Item Type: Thesis (Masters)
Additional Information: RTMT 658.155 2 Per a-1 2019
Uncontrolled Keywords: Risk Analysis, Risk Mitigation, Failure Mode Effect Analysis
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management > 61101-(S2) Master Thesis
Depositing User: Feby Diana Asia Mulia Perdana
Date Deposited: 16 Dec 2021 08:25
Last Modified: 16 Dec 2021 08:25
URI: http://repository.its.ac.id/id/eprint/61696

Actions (login required)

View Item View Item