Hidayat, Safril Taufiq (2019) Formulasi Waktu Baku Pada Perusahaan Engineering To Order Dengan Melibatkan Time Driver Variabel (TDV). Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
09211650014011-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2022. Download (2MB) | Request a copy |
Abstract
Penelitian tentang Formulasi Waktu Baku pada perusahaan Engineering to Order (ETO) yang melibatkan variable time driver (TDV) telah dilakukan. Penelitian ini dimotivasi oleh peningkatan permintaan pasar untuk industri ETO, sehingga perusahaan harus meningkatkan perencanaan mereka. Waktu standar dapat digunakan sebagai alat untuk meningkatkan kualitas perencanaan. Penelitian dilakukan dengan menggunakan metode stowatch time study (STS) dan dilanjutkan dengan metode standard data system (SDS). Pengukuran STS menghasilkan waktu pengamatan yang akan diproses menjadi waktu baku. Metode SDS dilakukan dengan meregresi waktu baku dengan TDV, yang akan menghasilkan formulasi waktu baku. Penelitian ini dilakukan di divisi fabrikasi baja PT Swadaya Graha. Studi ini dilakukan pada 11 kegiatan kritis yang terdiri dari 21 elemen kerja kritis, menghasilkan 161 variasi pengukuran STS. Formulasi waktu baku kemudian dijustifikasi untuk menunjukkan tingkat error. Hasil justifikasi menunjukkan tingkat error yang cukup rendah di setiap aktivitas, dengan nilai error 5,5% (penggilingan), 1,2% (menandai), 0,3% (Pemotongan Gas), 2,8% (Pemangkasan geser), 3, 7% (Membungkuk Tekan), 2,4% (Bending Roll), 1,1% (pemrosesan), 3,8% (pengelasan), 3,2% (NDT), 0,5% (sandblasting), dan 0,9% (pengecatan).
================================================================================================
Research on standard time formulations involving time drivers variable (TDV) for Engineering to Order companies have been carried out. This research was motivated by an increase in market demand for the ETO industry, so companies must improve their planning. Standard time can be used as a tool to improve quality of planning. The STS method was followed by the standard data system (SDS) method. STS measurement results in the observation time that will be processed into a standard time. The SDS method is done by regressing the standard time with TDV, which will produce a standard time formulation. This research was conducted at PT Swadaya Graha's steel fabrication division. The study was conducted on 11 critical activities consisting of 21 critical work elements, resulting in 161 variations of STS measurements. The standard time formulation is then justified to show the error rate. The result of justification shows a fairly low error rate in each activity, with a 5.5% error value (grinding), 1.2% (marking), 0.3% (Gas Cutting), 2.8% (Shear trimming), 3, 7% (Bending Press), 2.4% (Bending Roll), 1.1% (processing), 3.8% (welding), 3.2% (NDT), 0.5% (sandblasting), and 0.9% (painting).
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RTMT 658.401 2 Hid f-1 2019 |
Uncontrolled Keywords: | Work Measurement, Stopwatch Time Study, Time Driver, Engineering to Order, Workload Analysis |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD56.25 Industrial efficiency--Measurement. Industrial productivity--Measurement. H Social Sciences > HD Industries. Land use. Labor > HD9706.2 Measuring instruments |
Divisions: | Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management > 61101-(S2) Master Thesis |
Depositing User: | SAFRIL TAUFIQ HIDAYAT |
Date Deposited: | 21 Dec 2021 02:48 |
Last Modified: | 21 Dec 2021 02:48 |
URI: | http://repository.its.ac.id/id/eprint/61810 |