Manajemen Risiko terhadap Proses Pengadaan Peralatan Permesinan Utama Kapal di PTX dengan Pendekatan Standar PMBOK

Haqi, Rayka Abdillah (2019) Manajemen Risiko terhadap Proses Pengadaan Peralatan Permesinan Utama Kapal di PTX dengan Pendekatan Standar PMBOK. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211440000100 - Undergraduate_Thesis.pdf] Text
04211440000100 - Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2022.

Download (4MB) | Request a copy

Abstract

Galangan kapal adalah salah satu sektor yang berperan penting menunjang industri kemaritiman Indonesia. Sampai saat ini, apabila dibandingkan dengan beberapa negara maju, industri galangan kapal Indonesia masih tertinggal jauh dari segi kualitas, harga maupun lama pengerjaan. Salah satu yang menjadi akar permasalahan belum mampu bersaingnya galangan Indonesia adalah masih kurangnya kemampuan dalam hal manajemen proyek. Berdasar panduan manajemen proyek PMBOK 6th edition (Project Management Body of Knowledge), satu dari 10 area pengetahuan manajemen proyek adalah manajemen pengadaan proyek. Manajemen pengadaan proyek adalah area pengetahuan yang berada dalam 3 kelompok proses pada manajemen proyek, yaitu planning, executing, dan controlling and monitoring. Pembangunan kapal baru merupakan salah satu bisnis utama galangan kapal, selain reparasi dan konversi. Dalam proyek pembangunan kapal baru, manajemen pengadaan untuk material mentah, komponen setengah jadi maupun komponen jadi, kerap menjadi salah satu penyebab tidak efisiennya proses pembangunan kapal. Dalam penelitian ini akan dilakukan analisis manajemen risiko terhadap proses pengadaan peralatan permesinan utama kapal di PTx, Surabaya. Selanjutnya, dalam penelitian ini akan dilakukan identifikasi risiko, analisis risiko, mitigasi risiko, dan pembuatan keputusan terhadap proses – proses yang terjadi saat pengadaan pembangunan kapal baru di PTx sesuai dengan standar kerangka kerja PMBOK 6th edition. Metode Expert judgement akan digunakan untuk menunjang tahapan – tahapan penelitian tersebut. Penelitian ini menghasilkan bahwa ketersesuian sistem pengadaan di PTx dengan PMBOK 6th edition cukup baik yaitu 71%. Kegagalan potensial dalam proses pengadaan di PTx ini berjumlah 52 dan 3 kegagalan potensial dengan RPN terbesar adalah yang bersangkutan dengan keuangan. Sebagai langkah mitigasi risiko terhadap kegagalan potensial, didapat 24 poin mitigasi risiko dan sebuah rekomendasi skema pengadaan untuk PTx. ================================================================================================
Shipyard is one of the sector that have role in supporting Indonesian maritime industry. Until now, if Indonesian shipyard industry is compared with others countries shipyard industry, we are still left behind them in quality, cost and time completion aspect. One of the root cause why Indonenisian shipyard industry still has low competitiveness is because of its low competence in project management. Based on project management guidance, PMBOK 6th edition, one of ten knowledge area is about project procurement management. Project procurement management is knowledge area that include in three project management processing group. Those are planning, executing, and controlling and monitoring. New building project is one of main shipyard core business, beside repairation and convertion. In new building project, procurement management about raw material, halfmade component, as well as fullmade component, commonly become one of causes why new building project isn’t efficient. In this research, it will be done an analysis of risk management about main engine equipments procurement process at PTx, Surabaya. After that, it will be done a risk identification, risk analysis, risk mitigation, and decision making in every new building procurement processes at PTx using PMBOK 6th edition framework standard. Expert judgement method will be used ini this research for supporting the working steps. The results of this research are the compliance of PTx procurement system with PMBOK 6th standard is 71%, the total of potential faulres are 52, and the top 3 of the potential failures are correlated with financial issue. For the risk mitigation, those are 24 point and 1 recommendation of procurement scheme have been arranged for PTx.

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 658.155 Haq m-1 2019
Uncontrolled Keywords: Galangan Kapal, Manajemen Risiko, Manejemen Pengadaan, PMBOK
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM298.5 Shipbuilding industri. Shipyards
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: RAYKA ABDILLAH HAQI
Date Deposited: 27 Dec 2021 16:38
Last Modified: 27 Dec 2021 16:38