Perhitungan Waktu Dan Biaya Pelaksanaan Pekerjaan Pada Proyek Pelebaran Jalan Frontage Simpang Tohpati - Simpang Pantai Siut, Denpasar Bali.

Riyangga, Yuris Eka (2019) Perhitungan Waktu Dan Biaya Pelaksanaan Pekerjaan Pada Proyek Pelebaran Jalan Frontage Simpang Tohpati - Simpang Pantai Siut, Denpasar Bali. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111615000034-Undergraduate_Theses.pdf] Text
10111615000034-Undergraduate_Theses.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2022.

Download (4MB) | Request a copy

Abstract

Proyek akhir ini merupakan perhitungan waktu dan biaya pelaksanaan pekerjaan pada proyek pelebaran jalan frontage simpang tohpati- simpang pantai siut. Perencanaan yang akan dilakukan terdiri dari penentuan item pekerjaan, penentuan metode pelaksanaan pekerjaan, penentuan sumber daya (tenaga kerja, material, dan alat), kapasitas produksi setiap jenis pekerjaan, dan manajemen pelaksanaannya.

Data yang didapatkan dari tugas akhir ini berupa gambar kerja, volume pekerjaan, spesifikasi teknik, dan jadwal pelaksanaan sebagai control hasil perencanaan. Gambar kerja digunakan untuk menghitung kembali volume pekerjaan, spesifikasi teknis akan digunakan sebagai landasan penetapan metode kerja, sedangkan jadwal pelaksanaan yang ada akan digunakan hanya sebagai pembanding dari hasil tugas akhir ini.

Metode pelaksanaan untuk menentukan network planning (jaringan kerja), agar dapat mengetahui waktu pelaksanaan yang paling singkat dengan meggunakan alat bantu MS. Projet 2013. Output dari software ini adalah Gantt-Chrat (Schedule dalam bentuk bar-chart), Network Planning, Resource Graph (Grafik sumber daya), laporan biaya, serta kurva S.
Perhitungan waktu dan biaya pelaksanaan pembangunan
menggunakan sumber referensi dari Permen PU No.28/PRT/M/2016 tentang Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum, gambar kerja, dan spesifikasi teknis. Oleh karena itu, tugas akhir ini membahas mengenai Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Pelebaran jalan frontage simpang tohpati – simpang pantai siut.
================================================================================================
This final project is a calculation of the time and cost of carrying out work on the widening project for the frontage road intersection of the Tohpati-Simpang Pantai Siut. The planning that will be carried out consists of determining work items, determining methods of carrying out work, determining resources (labor, material, and tools), production capacity of each type of work, and management of its implementation.
The data obtained from this final assignment is in the form of work drawings, work volume, technical specifications, and implementation schedule as a control of planning results. Working drawings are used to recalculate the volume of work, technical specifications will be used as the basis for determining work methods, while the existing implementation schedule will be used only as a comparison of the results of this final project.
Implementation method to determine network planning, so that it can find out the shortest implementation time by using MS tools. Projet 2013. The output of this software is Gantt-Chrat (Schedule in the form of bar-chart), Network Planning, Resource Graph, resource reports, and S curve.
Calculation of the time and cost of implementing development use reference sources from Minister of Public Works No.28 / PRT / M / 2016 concerning Guidelines for Price Analysis for Public Works Unit, work drawings, and technical specifications. Therefore, this final project discusses the Calculation of Time and Costs for Implementation of Development Widening the road frontage intersection tohpati - the intersection of siut beach.
Keywords: Time and cost, Contractor Price Analysis.

Item Type: Thesis (Undergraduate)
Additional Information: RSIS 692.5 Riy p-1 2019
Uncontrolled Keywords: Waktu dan biaya, Analisa Harga Kontraktor.
Subjects: H Social Sciences > HB Economic Theory > HB846.2 Cost benefit analysis
T Technology > T Technology (General) > T56.8 Project Management
T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: YURIS EKA RIYANGGA
Date Deposited: 30 Dec 2021 08:45
Last Modified: 30 Dec 2021 08:45
URI: http://repository.its.ac.id/id/eprint/61898

Actions (login required)

View Item View Item