Pada sistem kelistrikan, proteksi yang baik merupakan hal yang
sangat penting guna meningkatkan kehandalan pada sistem tersebut. Hal
ini dapat terwujud dengan sistem koordinasi proteksi terutama pada
setting rele yang tepat. Pada setiap rele memiliki setting untuk
mengamankan sistem dari gangguan dan selanjutnya dikoordinasikan
dengan rele lainnya dengan tujuan dapat melokalisir gangguan yang
terjadi. Dari tujuan tersebut, kurva karakteristik pada rele disesuaikan
berdasarkan kemungkinan besar arus gangguan yang timbul sehingga
didapatkan waktu pemutusan CB yang tepat. Pada tugas akhir ini
dibahas mengenai penggunaan metode kurva karakteristik tripping nonstandart
pada rele dimana karakteristik ini memiliki keunggulan dalam
waktu kerja rele yang lebih cepat sehingga waktu pemutusan CB juga
menjadi lebih cepat dibandingkan dengan karakteristik rele pada
umumnya. Hal ini dikarenakan perbedaan yang mendasar dari
persamaan yang digunakan pada rele sehingga menghasilkan bentuk
kurva karakteristik yang berbeda. Dari hasil simulasi dengan
menggunakan metode kurva karakteristik tripping non-standar yang
diterapkan berdasarkan data plant PT. PLN (Persero) APJ Gilimanuk,
didapatkan waktu kerja rele sebesar 503ms sedangkan dengan metode
pada umumnya memerlukan waktu kerja rele sebesar 755ms sehingga
didapatkan selisih waktu penurunan sebesar 252ms. Dengan begitu
metode kurva karakteristik tripping non-standart dapat mengatasi arus
gangguan lebih cepat.

=====================================================================

In electrical system, a good protection is very important to
improve reliability in the system. This can be realized by coordination
systems of protection, especially in right setting of the relay. At each
relay has a setting to secure the system from interference and
subsequently coordinated with other relays in intention to localize from
the fault. From these objectives, the characteristic curve is adjusted
based on the possibility fault currents that occur to obtain a proper
operation time of CB. In this final project discussed about the use of
method non-standard tripping characteristic curve in the relay where this
characteristic has the advantage of operation time relay faster so that the
operation time of CB also be faster than the characteristics of the relay
in general method. This is due to a fundamental difference from the
equation used in the relay so that the result in different forms of
characteristic curve. From the simulation results using the method nonstandard
tripping characteristic curve applied by the data plant PT. PLN
(Persero) APJ Gilimanuk, obtained operation time relay is 503ms while
with generally methods require a operation time relay is 755ms, so its
obtain the time difference decreased by 252ms. Thus non-standard
tripping characteristic curve method can be overcome a fault current
faster.

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.317 Nug s
Uncontrolled Keywords: proteksi, koordinasi, rele, kurva karakteristik tripping non-standart ================================================================== protection, coordination, relay, non-standard tripping characteristic curve
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays. Protective relays--Security measures.
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: - Taufiq Rahmanu
Date Deposited: 27 Mar 2019 07:59
Last Modified: 27 Mar 2019 07:59
URI: http://repository.its.ac.id/id/eprint/62613

Actions (login required)

View Item View Item