Analisa perencanaan investasi pembangunan perumahan di Kabupaten Pati

Lukito, Agus (2015) Analisa perencanaan investasi pembangunan perumahan di Kabupaten Pati. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3112106055-Undergraduate_Theses.pdf]
Preview
Text
3112106055-Undergraduate_Theses.pdf - Published Version

Download (3MB) | Preview
[thumbnail of 3112106055-Paper.pdf]
Preview
Text
3112106055-Paper.pdf - Published Version

Download (637kB) | Preview
[thumbnail of 3112106055-Presentation.pdf]
Preview
Text
3112106055-Presentation.pdf - Presentation

Download (669kB) | Preview

Abstract

Kebutuhan akan rumah tinggal semakin meningkat. Hal itu
disebabkan oleh semakin meningkatnya pertumbuhan populasi
penduduk di suatu dareah. Salah satu cara memenuhi kebutuhan rumah
tinggal adalah dengan membangun sebuah perumahan. Pembangunan
perumahan harus sesuai peraturan-peraturan pemerintah mengenai
perumahan dan permukiman. Namun, pembangunan perumahan juga
harus memenuhi kelayakan secara finansial. Tugas Akhir ini bertujuan
untuk melakukan perencanaan site plan dan menganalisa kelayakan
finansial investasi pembangunan perumahan di Kabupaten Pati.
Dalam merencanakan investasi pembangunan perumahan
perlu dibuat perencanaan konsep-konsep pembangunan perumahan dan
dianalisa total biaya dalam pembangunan perumahan. Analisa aspek
finansial dilakukan dengan menghitung Net Present Value (NPV),
Payback Period (PP) dan Internal Rate of return (IRR). Proyek
perumahan ini dibangun diatas lahan seluas 5,64 ha dengan persentase
pembagian lahan 60% peruntukkan bangunan dan 40% untuk
prasarana lingkungan perumahan. Dari hasil perencanaan didapat
jumlah tipe 36/72 sebanyak 196 unit dan tipe 45/98 sebanyak 179 unit
dengan total keseluruhan sebanyak 375 unit rumah. Dari analisa
kelayakan finansial biaya investasi yang dibutuhkan sebesar
Rp103.981.805.112,- dengan menghasilkan nilai NPV sebesar
Rp39.289.903.166,-, payback period didapat pada tahun ke-2 dan nilai
IRR = 59,66% > MARR = 12%. Dengan begitu investasi perumahan ini
dinilai layak untuk dilakukan. ========== Demand for28T 28Tresidential28T 28Thas increased28T. 28TIt is due to28T
28Tincreasing28T 28Tpopulation growth28T 28Tin28T 28Tan area.28T 28TOne way to28T 28Tmeet28T 28Tthe
needs of28T 28Tresidential28T 28Tis28T 28Tto28T 28Tbuild28T 28Ta28T 28Thousing28T. 28THousing28T 28Tconstruction28T
28Tmust28T 28Tconform28T 28Tgovernment regulations28T 28Ton housing28T 28Tand28T 28Tsettlements28T.
28THowever28T, 28Thousing construction28T 28Tmust also meet28T 28Tfinancial28T 28Teligibility28T.
28TThis final project28T 28Taims28T 28Tto plan28T 28Tsite plan28T 28Tand28T 28Tanalyze28T 28Tthe financial
feasibility of28T 28Tresidential28T 28Tconstruction28T 28Tinvestment28T 28Tin28T 28TPati regency28T.
28TIn28T 28Tresidential28T 28Tconstruction28T 28Tinvestment28T 28Tplan28T 28Tneeds to know
how to analyze28T 28Tof regency28T 28Tdevelopment concepts28T 28Tand28T 28Tthe total28T 28Tcost
of28T 28Tthe28T 28Tconstruction of regency28T. A28Tnalyzed28T 28Tthe financial aspects28T 28Tby
calculating28T 28Tthe Net28T 28TPresent Value28T 28T(28TNPV), Payback Period (PP) and
Internal Rate of Return (IRR). 28TThis28T 28Tregency28T 28Tproject28T 28Tbuilt on an area28T
by28T 5.6428T 28Tha28T 28Twith a28T 28Tpercentage share28T 28Tof 6028T% for 28Tland28T 28Tand28T 28T4028T% 28Tof
the building28T 28Tdesignated28T 28Tfor28T 28Tresidential neighborhood28T 28Tinfrastructure28T.
T28The results28T is 28Tobtained28T 28Tplanning28T 28Tquantity28T 28Tby 19628T 28Tunits28T 28Tof type28T
28T36/7228T 28Tand28T 28T45/9828T 28Ttype28T 28Tas many as28T 28T17928T 28Tunits28T 28Tfor a total of28T 28T37528T
28Tregency units28T. 28TFrom the28T 28Tanalysis of28T 28Tthe financial feasibility of28T 28Tthe
investment28T 28Tcosts28T 28Trequired28T 28Tfor28T 28TRp103.981.805.11228T, 28T-28T 28Tto28T 28Tproduce the28T
28TNPV of28T 28TRp39.289.903.16628T,28T-28T, Payback Period produced in the last 2
years and IRR value is = 59,66% > MARR = 12%. Therefore the
28Tresidential28T 28Tinvestment28T 28Tis considered to be done.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 332.632 47 Luk a
Uncontrolled Keywords: Kelayakan finansial, perencanaan perumahan, Financial feasibility, regency planning
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.28 Planning. Business planning. Strategic planning.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 23 Apr 2019 06:42
Last Modified: 23 Apr 2019 06:42
URI: http://repository.its.ac.id/id/eprint/62807

Actions (login required)

View Item View Item