Desain bangunan pengolahan limbah cair peternakan babi pemanfaatan kembali hasil pengolahannya

Putra, I Komang Adi (2015) Desain bangunan pengolahan limbah cair peternakan babi pemanfaatan kembali hasil pengolahannya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3310100081-Undergraduate_Theses.pdf - Published Version

Download (8MB) | Preview
[img]
Preview
Text
3310100081-paper.pdf - Published Version

Download (513kB) | Preview
[img]
Preview
Text
3310100081-presentation.pdf - Presentation

Download (1MB) | Preview

Abstract

Pencemaran air bersih dan bau yang tidak sedap merupakan dampak negatif dari usaha peternakan babi secara tradisional. Penduduk yang tinggal di sekitar peternakan babi menuntut adanya penutupan usaha peternakan babi karena pencemaran tersebut. Akibat penutupan sepihak oleh warga sekitar, peternak tidak memiliki mata pencaharian lagi sehingga tidak mampu memenuhi kebutuhan keluarga. Perencanaan instalasi pengolahan air limbah (IPAL) dilakukan untuk membantu peternak babi dalam mengelola limbah. Perencanaan menggunakan data pengukuran lapangan dan pemeriksaan kualitas limbah cair. Anaerobic baffled reactor (ABR) dan constructed wetland (CW) merupakan unit yang relatif murah untuk diterapkan. Biaya konstruksi dihitung dengan menggunakan daftar harga satuan barang dan upah kerja Pemerintah Kota Denpasar 2015. Dimensi ABR dan CW yang diperoleh berturut-turut 3,4 m x 1 m x 1,5 m dan 92 m x 1,8 m x 0,3 m. Biaya konstruksi untuk ABR dan CW berturut-turut Rp 80.800.000,- dan Rp 195.800.000,-. Efluen dari kedua bangunan digunakan kembali untuk kegiatan pembersihan kandang dan pemandian ternak. Rasio B/C yang diperoleh untuk ABR dan CW berturut-turut yaitu 4,89 dan 2,27. =========== Water pollution from pig wastes and malodours emanating from traditional pig farms is negative impact of pig farming. Because of bad odour and water pollution, inhabitans living near the pig farms insisted the pig farmers to shut the pig farming. Since the pig farming is their only job, the stoppage will leave them with no jobs and salaries. The design of wastewater treatment plant for piggery wastewater is conducted to help pig farmers manage the wastewater. The design is using data of field measurement and wastewater analysis. An anaerobic baffled reactor (ABR) and a constructed wetland (horizontal sub-surface flow) (CW) are lowcost treatment plants such that they are becoming appropriate to be applied for traditional pig farmers to manage pig waste. The calculation of construction cost of the two units is conducted by using the unit price of goods and wages (harga satuan barang dan upah kerja) published by the government of Denpasar in 2015. The dimension obtained for ABR and CW is 3.4 m x 1 m x 1.5 m and 92 m x 1.8 m x 0.3 m, respectively. The construction cost for ABR and CW is IDR 80,800,000.00 and IDR 195,800,000.00, respectively. The effluent generated from the two units is utilised for barn and pig washing. The B/C ratio for ABR and CW is 4.89 and 2.27, respectively

Item Type: Thesis (Undergraduate)
Additional Information: RSL 628.167 44 Put d
Uncontrolled Keywords: anaerobic baffled reactor, constructed wetland, pemanfaatan efluen, pengolahan air limbah, peternakan babi, anaerobic baffled reactor, constructed wetland, effluent utilisation, traditional pig farming, wastewater treatment
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD479.3 Saline water conversion
T Technology > TD Environmental technology. Sanitary engineering > TD898.8.C67 Waste disposal
Divisions: Faculty of Civil Engineering and Planning > Environment Engineering > 25201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 03 May 2019 07:02
Last Modified: 03 May 2019 07:02
URI: http://repository.its.ac.id/id/eprint/62920

Actions (login required)

View Item View Item