Sebagai salah satu perusahaan pembangkit listrik yang memasok sebagian
kebutuhan listrik pada sistem Jawa- Bali, PT Pembangkitan Jawa Bali (PJB)
mendirikan sebuah PLTMG yang berkapasitas 3 x 1 Mega Watt (MW) di Pulau
Bawean, Gresik, Jawa Timur. Pendirian PLTMG Bawean ini bertujuan untuk
memenuhi kebutuhan listrik pada Pulau Bawean. Namun pada operasinya saat ini
capacity factor PLTMG Bawean masih terdapat pada kisaran nilai 30%. Hal ini
disebabkan kurangnya pasokan CNG pada PLTMG Bawean. Saat ini PT. PJB
berupaya melakukan pengadaan kapal yang memiliki kapasitas 2 MMSCF (60000
m3) agar dapat memenuhi kebutuhan CNG pada PLTMG Bawean. Permasalahan
yang diangkat pada penelitian ini adalah bagaimana sebaiknya pola operasi
pengiriman kapal dengan mempertimbangkan ketidakpastian cuaca, jumlah
konsumsi CNG, serta lama proses operasi (loading rate). Pada penelitian ini akan
dilakukan simulasi yang bertujuan untuk: mengembangkan model eksisting
mengenai proses pengiriman CNG dari Gresik ke PLTMG Bawean serta
menentukan rencana pola operasi kapal untuk antisipasi cuaca buruk. Hasil dari
penelitian ini adalah model eksisting dengan menggunakan estimasi kebutuhan
konsumsi CNG pada PLTMG Bawean pada capacity factor 80% serta pola
operasi kapal yang digunakan adalah periodic review dalam 3 hari, dengan jumlah
muatan order up-to-level
=========================================================================================================
As one of the power plants that supply most of the electricity needs in the
Java-Bali system, PT Pembangkitan Jawa Bali (PJB) has established a PLTMG
with 3 x 1 Mega Watt (MW)of capacity in Bawean Island, Gresik, East Java.
PLTMG Bawean establishment aims to meet the electricity needs of the Bawean
Island. But at the moment operation, capacity factor PLTMG Bawean still present
in the range of 30% value. This is due to the lack of fuel supply at PLTMG Bawean.
Currently, PT. PJB seeks to procure vessels having a capacity of 2 MMSCF (60000
m3) in order to meet fuel needs at PLTMG Bawean. Issues raised in this study is
how best to dispatch the ship with the operating pattern considering the uncertainty
of the weather, the number of CNG consumption, as well as the long process of
operation (loading rate). This research will be conducted simulation that aims to:
develop existing models of the fuel delivery process from Gresik to PLTMG Bawean
and determine the pattern of ship operations plan for anticipated bad weather.
Results of this study was to use the existing model of the estimated fuel consumption
at PLTMG Bawean at 80% capacity factor. And the operation pattern used boats
are periodic review within 3 days, the number of cargo orders up-to-level.

Item Type: Thesis (Undergraduate)
Additional Information: RSI 658.7 Pra s
Uncontrolled Keywords: Pola Operasi Pengiriman, Ketidakpastian, Simulasi, Kapal CNG
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 29 May 2019 02:43
Last Modified: 29 May 2019 02:43
URI: http://repository.its.ac.id/id/eprint/63080

Actions (login required)

View Item View Item