PLTMH adalah salah satu alternatif pembangkit listrik yang
dapat mengatasi kekurangan sumber energi listrik terutama di
daerah terpencil. Dalam tugas akhir ini akan direncanakan
PLTMH dengan memanfaatkan Bendung Gerak Jatimlerek,
Jombang yang diharapkan dapat membantu masyarakat
sekitarnya untuk memenuhi kebutuhan listrik. Perhitungannya
dimulai dari analisa untuk mengetahui potensi daya dan energi
listrik, perencanaan bangunan pembangkit PLTMH, dan analisa
ekonominya. Dari hasil analisa diketahui debit andalan untuk
PLTMH sebesar 7,98 m3/detik dan diirencanakan tinggi jatuh
sebesar 4 m. Karena Sungai Brantas di Jombang terletak di
daerah dataran rendah yang mempunyai nilai kemiringan yang
kecil, maka letak rumah turbinnya sangat jauh. Setelah dilakukan
perhitungan kehilangan energi, didapatkan head efektif untuk
PLTMH sebesar 3,71 m, sehingga daya yang dapat dihasilkan
oleh PLTMH sebesar 197,49 kW atau setara dengan 1.730.012
kWh. Analisa ekonomi menghasilkan nilai biaya pembangunan
PLTMH sebesar Rp 16.550.000.000,- (Enam belas milyar lima
ratus lima puluh juta rupiah). Sedangkan analisa kelayakan yang
dihitung dengan tiga metode yaitu NPV, BCR, dan PbP
memberikan hasil bahwa PLTMH ini layak.
==========================================================================================================
Micro Hydro Power Plant (MHPP) is one of another alternative
power plant which could be the solution of electricical energy
especially in small village. In this final, will be planned MHPP by
using Jatimlerek Jombang Motion Weir to help villagers to fulfill
electricity needs. Calculation was started from analyzed to
determine the potential of the power and energy, plant
construction planning MHPP, and economic analysis. The results
of the anlysis are known for MHPP discharge is 7,98 m3/s and
head design is 4 m. Because of the Brantas River in Jombang
located in lowland areas that have a small slope, then the
location of Powerhouse far away. After the calculation of energy
loss, the effective head for MHPP obtained by 3,71 m, so that
power can be generated by the MHPP is 197,49 kW or 1.730.012
kWh. Economic analysis bring out budgets plan is Rp
16.550.000.000,- . While a feasibility analysis was calculated
with tree methods there are NPV, BCR, and PbP giving a results
that MHPP is feasible.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 621.312 134 Lis p
Uncontrolled Keywords: PLTMH, Bendung Gerak Jatimlerek, debit, head, listrik, analisa ekonomi, analisa kelayakan
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 11 Jun 2019 03:47
Last Modified: 11 Jun 2019 03:47
URI: http://repository.its.ac.id/id/eprint/63102

Actions (login required)

View Item View Item