Metode Pelaksanaan Proyek Pembangunan Bendung Gerak Sembayat Kabupaten Gresik

Kurniawan, Achmad Wachid Wahyu and Purwati, Mayta Ayu (2015) Metode Pelaksanaan Proyek Pembangunan Bendung Gerak Sembayat Kabupaten Gresik. Diploma thesis, Institut Technology Sepuluh Nopember.

[img]
Preview
Text
3112030015-3112030050-Non Degree.pdf - Published Version

Download (2MB) | Preview

Abstract

Salah satu cara pemanfaatan sumber daya air yang mencakupi kebutuhan air irigasi, kebutuhan air minum dan pengendalian banjir tentunya bagi masyarakat yaitu pembangunan bendung gerak. Desa Sidomukti Kecamatan BungahKabupaten Gresik masih memiliki daerah-daerah yang sistem irigasi dan pengolahan air minumnya kurang baik, terutama pada musim kemarau.Melihat kondisi tersebut, maka pemerintah propinsi jawa timur khususnya di Desa Sidomukti Kecamatan Bungah Kabupaten Gresik membangun bendung gerak sembayat yang letaknya di Kabupaten Gresik.Sistem manejemen kontruksi dapat mengoptimalkan pemanfaatan sumber daya yang meliputi tenaga manusia,peralatan,biaya,dan waktu pelaksanaan. Dalam penulisan tugas akhir ini menggunakan metode pelaksanaan yang sama persis seperti yang ada dilapangan sehingga dari data yang kami dapat dari lapangan kami dapat menghitung volume pekerjaan, jumlah alat berat yang dibutuhkan, produktifitas alat berat, kebutuhan bahan dan material, kebutuhan tenaga kerja, rencana anggaran biaya hingga mendapatkan kurva s. Pada proyek pembangunan Bendung Gerak Sembayat Kecamatan Bungah Kabupaten Gresik memakan biaya iii Rp311.039.760.567. Mulai dari pekerjaan Persiapan, pekerjaan sungai baru atau sudetan yang meliputi Perlindungan Dasar Sungai bagian Hulu (Apron) dan Palung Sungai (Riverbed), Perlindungan Dasar Sungai bagian Hilir (Apron) dan Palung Sungai (Riverbed), Bendung Pelimpah/Overflow Weir, Pekerjaan Jembatan, Dinding Abutment bagian hulu, setelah pekerjaan sudetan (sungai baru) maka melanjutkan pekerjaan Saluran bypass (bypass channel), pekerjaan Intake Irigasi. Pada proyek ini menggunakan alat berat yaitu backhoe, bulldozer, dumptruck dan compactor untuk pekerjaan clearing, galian, urugan, sedangkan untuk pekerjaan struktur menggunakan truck mixer, concrete vibrator, dan pekerjaan dewatering menggunakan alat seperti engine pump, submergesible, dan juga pipa sebagai alat pembantunya. Proyek ini memakan waktu selama 929 hari kalender. ========================================================================================================== One of function water resources mode which cover irrigation water requirement, and the requirements of drink water and flood control for the people is moving weir construction desa sidomukti kecamatan bungah kabupaten gresik still has regions that using a poor irrigation system and drink water processing, especially in the summer condition. In that case, so provincial government of east java especially in desa sidomukti kecamatan bungah kabupaten gresik build the sembayat moving weir and the location in kabupaten gresik. Management system of construction can optimize the function of the resources such as human force, equipment, cost and its time will be held. In this writing of final project is using similar implementation method like what they do in the reality project/ field so from the data that we got from reality project/field we could calculate the volume of work, total heavy equipment that we need, heavy equipment productivity, material and stuff requipment, workers need, budget plan till we got the S curve. v On the construction project of sembayat moving weir kecamatan bungah kabupaten gresik is spending cost Rp310.986.410.567 start from working preparation, the new river work which covers head water of river and riverbed, and protection the downstream of the river; over weir, bridge work, the wall of abutment downstream. After the new river work have done, irrigation intake work. This project uses weight equipment such as backhoe, bulldozer and dumptruck for clearing, digging and burying. While structuring uses truck mixer amd concrete vibrator. In the meantime dewatering uses engine pump, submergesible and also pipe as the medium. This project took until 929 days of calendar.

Item Type: Thesis (Diploma)
Additional Information: RSS 627.8 Kur m
Uncontrolled Keywords: Metode Pelaksanaan Bendungan, Bendung Gerak Sembayat, Sumber Daya Air.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 19 Jun 2019 06:12
Last Modified: 19 Jun 2019 06:12
URI: http://repository.its.ac.id/id/eprint/63156

Actions (login required)

View Item View Item