Penjadwalan Pelaksanaan Ditinjau Dari Segi Biaya Dan Waktu Pada Gedung Lab. PAUD Universitas Negeri Surabaya

Syahputra, Hasan Eka and Alfi, Muhsinah (2015) Penjadwalan Pelaksanaan Ditinjau Dari Segi Biaya Dan Waktu Pada Gedung Lab. PAUD Universitas Negeri Surabaya. Diploma thesis, Institut Technology Sepuluh Nopember.

[img] Text
3112030041-3112030077-Undergraduate Thesis.pdf - Published Version

Download (5MB)

Abstract

Proyek pembangunan gedung LAB. PAUD Universitas Negeri Surabaya dengan luas bangunan ± 1740 m2 memerlukan penjadwalan pelaksanaan yang di tinjau dari perhitungan waktu dan biaya pelaksanaan. Perhitungan waktu dan biaya pelaksanaan menggunakan sumber referensi buku dan pengalaman kontraktor karena dalam perhitungan RAB pelaksana biaya yang dibutuhkan harus real. Maka tugas akhir ini membahas mengenai penjadwalan pelaksanaan di tinjau dari segi biaya dan waktu. Analisa yang dilakukan pada perhitungan waktu dan biaya pelaksanaan ini meliputi gambar desain bangunan, perhitungan volume tiap pekerjaan, metode pelaksanaan yang digunakan, kebutuhan sumber daya seperti pekerja, material dan alat berat yang digunakan, produktifitas pekerjaan. Setelah analisa sudah didapatkan maka dapat menghitung waktu pelaksanaan dan biaya pelaksanaan yang diperlukan. Dengan menggunakan metode AOA pada proyek Gedung Lab. PAUD UNESA (Universitas Negeri Surabaya) dapat dioptimalisasikan. Sehingga dalam analisa perhitungannya mengadopsi dari analisa harga satuan dan metode pelaksanaan vi yang ada. Data tersebut di kelola kembali dengan metode AOA sehingga menghasilkan waktu dan biaya optimal. Hasil yang diperoleh berdasarkan analisa perhitungan didapatkan waktu pelaksanaan selama 9 bulan 19 hari atau 259 hari. Biaya pelaksanaan dibutuhkan sebesar Rp 13.096.268.072,-. ========================================================================================================= LAB building project. ECD State University of Surabaya with a building area of + 1740 m2 require scheduling implementation in the revie of the calculation of the time and cost of implementation. Timing and cost of implementation using reference books and experience of the contractor because in the calculation of the cost of implementing the required RAB must be real. So the task is to discuss the scheduling review the implementation in term of cost and time. The analysis used in this calculation of time and implementation cost consist of building design drawing, calculation of the volume each jobs, implementation m ethods are used, resource needs as labors, materials and heavy machine are used and work productivity. After the analysis has been obtained, it can compute implementation time and cost project that used. In the preparation of planning network using AOA on building projects Lab. ECD UNESA (State University of Surabaya) for this project is very simple method that in adopting the calculation analysis of unit price analysis and implementation method that exist. The data which is managed by the AOA method viii can produce the optimal time and cost.The result obtained by the analysis found the project time is nine months and eighteen days or 259 days. The implementation cost found Rp 13.096.268.072,-.

Item Type: Thesis (Diploma)
Additional Information: RSS 692.5 Sya p
Uncontrolled Keywords: Penjadwalan Pelaksanaan , Waktu and Biaya Pelaksana.
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > (D3) Diploma
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 20 Jun 2019 06:58
Last Modified: 20 Jun 2019 06:58
URI: http://repository.its.ac.id/id/eprint/63174

Actions (login required)

View Item View Item