Perencanaan Ulang Jalan Kereta Api Jalur Rel Ganda Di Bojonegoro Surabaya Km 159,600 M Sampai Dengan Km 161,000 M

Putro, Febrianto Nyoto (2014) Perencanaan Ulang Jalan Kereta Api Jalur Rel Ganda Di Bojonegoro Surabaya Km 159,600 M Sampai Dengan Km 161,000 M. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3112040608-presentation.pdf - Presentation

Download (2MB) | Preview
[img]
Preview
Text
3112040608-Undergraduate_Theses.pdf - Published Version

Download (16MB) | Preview

Abstract

Jalan kereta api atau biasa disebut rel kereta api, merupakan prasarana utama dalam perkeretaapian dan merupakan ciri khas moda transportasi kereta api karena rangkaian kereta api hanya bisa melewati jalan yang dibuat khusus untuknya yakni rel kereta api. Rel inilah yang memandu rangkaian kereta api tersebut berpindah dari satu tempat ke tempat lainnya. Dengan semakin banyaknya peminat akan moda transportasi ini maka jadwal perjalanan kereta api menjadi semakin padat. Di Indonesia jalur kereta api yang ada masih menggunakan satu jalur, sehingga jadwal perjalanan kereta api harus diatur sedemikian rupa supaya tidak terjadi kecelakan antar rangkaian kereta api yang bersimpangan hal ini yang menyebabkan seringnya perjalanan kereta api menjadi terlambat. Pembangunan jalur rel ganda kereta api diharapkan bisa meningkatkan kelancaran perjalanan kereta api sehingga antrian akibat simpangan antara dua rangkaian kereta api bisa dihindarkan. Jalur kereta api MSP Paket T12 merupakan jalur rel ganda yang dijadwalkan akan selesai tahun ini, dimana jalur ini ii merupakan jalur utama yang menghubungkan stasiun bojonegoro dan surabaya. Dalam tugas akhir ini akan dilakukan perencanaan ulang yang meliputi perencanaan trase untuk alinyemen jalur ganda, perencanaan geometri meliputi alinyemen horisontal dan alinyemen vertikal, perhitungan struktur konstruksi jalan rel yang meliputi rel, penambat, bantalan, dan balas, perencanaan wesel dan sepur di emplasemen, perencanaan balas dan kontrol stabilitas tanah dengan program Plaxis dan Geoslope. ========== Railroad or railroad commonly called, is a major railway infrastructure and is the hallmark of railway transportation as a series of trains can only pass road, built for her the railroad tracks. This is a series of rails that guide the trains to move from one place to another. As more and more enthusiasts will be the mode of transportation is the train travel schedule is becoming increasingly congested. Indonesia's existing railway lines are still using one lane, so that trains travel schedule should be arranged in such a way so that no series of accidents between trains that intersects this is the cause of frequent rail travel becomes too late. Construction of double track railway lines expected to improve the smoothness of the train trip so the queue due to the deviation between the two sets of trains can be avoided. MSP railway line T12 package is a double rail line is scheduled to be completed this year, in which this pathway is the main route connecting the station bojonegoro and Surabaya. In this final project will be re-planning that includes planning alignment for double track alignment, geometric design includes horizontal alignment and vertical alignment, railway iv construction structure calculations that include rail, fastening, bearing, and replied, planning notes and rail in railway yard, planning ballast and soil stability control with Plaxis program and Geoslope.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 625.100 288 Put p
Uncontrolled Keywords: Transportasi, Rel ganda, Stasiun, Jadwal, Rute,
Subjects: T Technology > TF Railroad engineering and operation
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > (D4) Diploma 4
Depositing User: - Davi Wah
Date Deposited: 03 Jul 2019 08:12
Last Modified: 03 Jul 2019 08:12
URI: http://repository.its.ac.id/id/eprint/63340

Actions (login required)