Studi Koordinasi Proteksi Dengan Mempertimbangkan Arc Flash Pada Sistem Kelistrikan PT. Heinz ABC Indonesia

Mahardika, Widho Wahyu (2019) Studi Koordinasi Proteksi Dengan Mempertimbangkan Arc Flash Pada Sistem Kelistrikan PT. Heinz ABC Indonesia. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111745000063-Undergraduate_Theses.pdf]
Preview
Text
07111745000063-Undergraduate_Theses.pdf

Download (1MB) | Preview

Abstract

PT. Heinz ABC Indonesia berada di jalan Randupitu-Gunung Gangsir, Penampon, Wonokoyo, Bangil, Pasuruan, Jawa Timur adalah perusahaan yang bergerak dibidang industri makanan dan minuman. Sistem kelistrikan PT. Heinz ABC Indonesia di suplai oleh PLN dan sebagai alternatif menggunakan 3 genset dengan kapasitas masing-masing 425 kW. Apabila terjadi gangguan(pemadaman) di salah satu area yang menyebabkan area lain menjadi padam maka proses produksi terhenti. Hal tersebut akan menyebabkan kerugian bagi perusahaan dan kerusakan pada peralatan. Untuk mengatasi adanya gangguan seperti hubung singkat diperlukan sistem proteksi yang terkoordinasi dengan baik dengan mempertimbangkan arc flash. Sehingga tidak hanya peralatan yang dilindungi tetapi juga para pekerja dari bahaya arc flash. Pengaman yang digunakan untuk melindungi peralatan yaitu pengaman LVCB. Untuk menganalisa bahaya arc flash serta jarak aman bagi pekerja yaitu dengan perhitungan incident energy menggunakan standar IEEE 1584-2002 dan NFPA-70E 2015. Software untuk simulasi menggunakan software ETAP 12.6. Setelah melakukan resetting nilai insiden energi ada penurunan pada Bus-Beban PLN1 yaitu 2,293 cal/cm2.
===============================================================================================================================
PT. Heinz ABC Indonesia is on Randupitu-Gunung Gangsir, Penampon, Wonokoyo, Bangil, Pasuruan, East Java, a company engaged in the food and beverage industry. Electrical system of PT. Heinz ABC Indonesia is supplied by PLN and as an alternative uses 3 generators with a capacity of 425 kW each. If there is a disturbance (blackout) in one area that causes other areas to go out, the production process will stop. This will cause losses to the company and damage to the equipment. To overcome the existence of interference such as short circuit, a well-coordinated protection system is needed by considering the flash arc. So that not only the equipment is protected but also the workers from the danger of arc flash. Safety is used to protect equipment, namely LVCB secure. To analyze the arc flash hazards and safety distance for workers, namely incident energy calculations using the IEEE standards 1584-2002 and NFPA-70E 2015. Software for simulation using ETAP 12.6 software. After resetting the value of the energy incident there was a decrease in the Bus-Beban PLN1 is 2,293 cal / cm2.

Item Type: Thesis (Other)
Additional Information: RSE 621.317 Mah s-1 2019
Uncontrolled Keywords: Arc Flash, Koordinasi Proteksi, Pengaman LVCB, Incident Energy.
Subjects: T Technology > T Technology (General) > T55 Industrial Safety
T Technology > T Technology (General) > T57.62 Simulation
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Widho Wahyu Mahardika
Date Deposited: 28 Mar 2023 02:12
Last Modified: 28 Mar 2023 02:12
URI: http://repository.its.ac.id/id/eprint/63807