Perencanaan peningkatan ruas jalan Sambiroto-Kweden STA. 0+000 - STA. 3+000 dengan menggunakan perkerasan kaku di Kabupaten Mojokerto - Provinsi Jawa Timur

Setiawan, Bayu Eko and Hariyanto, Rissandy Daniar Pratama (2014) Perencanaan peningkatan ruas jalan Sambiroto-Kweden STA. 0+000 - STA. 3+000 dengan menggunakan perkerasan kaku di Kabupaten Mojokerto - Provinsi Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3111030091-3111030093-Non Degree.pdf

Download (8MB) | Preview

Abstract

Proyek peningkatan ruas jalan Sambiroto – Kweden merupakan proyek pelebaran jalan. Ruas jalan Sambiroto – Kweden merupakan Jalan Alternatif ke Kabupaten Jombang – Provinsi Jawa Timur dan daerah lainnya. Proyek ini dilakukan bertujuan untuk memberikan tingkat pelayanan yang lebih baik, dikarenakan beberapa titik di jalan ini telah rusak dan berlubang. Selain itu, lebar jalan yang ada masih belum memadai bagi pengguna jalan. Agar dapat terwujudnya kelancaran dan kenyamanan dalam berlalu lintas maka direncakan proyek peningkatan ruas jalan Sambiroto – Kweden STA. 0+000 – STA. 3+000 Kabupaten Mojokerto – Provinsi Jawa Timur. Peningkatan jalan meliputi perhitungan Analisis Kapasitas Jalan dengan metode Manual Kapasitas Jalan Indonesia, 1997 (MKJI 1997) jalan luar kota. Menghitung tebal perkerasan jalan menggunakan perkerasan kaku dengan metode SNI Perencanaan Perkerasan Jalan Beton Semen Departemen Permukiman dan Prasarana Wilayah, Pd T 14 – 2003. Geometrik jalan dengan menggunakan Dasar – Dasar Perencanaan Geometrik, (oleh Silvia Sukirman). Perencanaan drainase dengan menggunakan metode SNI – 03 – 342 – 1994 (Tata Cara Perencanaan Drainase Jalan), dan rencana anggaran biaya dengan menggunakan HSPK (Harga Satuan Pokok Kegiatan) Provinsi Jawa Timur tahun 2014. Dari hasil perhitungan perencanaan peningkatan ruas jalan Sambiroto – Kweden, pelebaran jalan dilakukan pada awal umur rencana tahun 2016 sesuai dengan Peraturan Pemerintah Nomor 34 tahun 2006 untuk jalan Kolektor Primer, yakni dibutuhkan lebar minimum 9 m, dikarenakan kondisi eksisiting lebar jalan hanya 4 m dengan tipe jalan 2/2 UD, sehingga perlu diperlebar menjadi 9 m dengan tipe jalan tetap 2/2 UD. Tebal perkerasan kaku 20 cm dengan beton K – 300 serta pondasi bawah dengan CBK 15 cm. Perencanaan saluran tepi drainase setelah dilebarkan dengan menggunakan bentuk persegi dengan material batu kali. Biaya yang dibutuhkan untuk pembangunan proyek ini adalah sebesar Rp. 18.568.136.915 (Terbilang Delapan Belas Milyar Lima Ratus Enam Puluh Delapan Juta Seratus Tiga Puluh Enam Ribu Sembelin Ratus Lima Lima Belas Rupiah). =========================================================================================================== Sambiroto road improvement project - Kweden a road widening project. Sambiroto roads - Kweden an Alternative Way to Jombang - East Java Province and other regions. The project was carried out aiming to provide a better level of service, due to some point on this road has been damaged and perforated. In addition, the width of the road is still not adequate for road users. In order to realization of smoothness and comfort in traffic then planned road improvement projects Sambiroto - Kweden STA. 0 +000 - STA. 3 +000 Mojokerto - East Java Province. Improved roads include Highway Capacity Analysis calculation method Indonesian Highway Capacity Manual, 1997 (MKJI 1997) outside the city streets. Calculate the pavement thickness using rigid pavement with SNI method of Cement Concrete Road Pavement Planning Ministry of Settlement and Regional Infrastructure, Pd T 14-2003. Geometric path using Basic - Basic Geometric Planning, (by Silvia Sukirman). Drainage plan using SNI - 03 - 342 - 1994 (the Road Drainage Planning Procedures), and the budget plan by using HSPK (Basic Unit Price Activity) of East Java Province in 2014. From the calculation of road improvement plan Sambiroto - Kweden, road widening is done at the beginning of the plan year 2016 in accordance with Government Regulation No. 34 of 2006 for Primary collector streets, which required a minimum width of 9 m, due to the condition eksisiting road only 4m wide with the type of road 2/2 UD, so it needs to be widened to 9 m with the type of road fixed 2/2 UD. 20 cm thick rigid pavement with concrete K - 300 and the subbase with CBK 15 cm. Planning the edge of the drainage channel after dilated by using a square shape with stone material. The cost required for construction of this project is Rp. 18,568,136,915 (Somewhat Eighteen Billion Five Hundred Sixty-Eight Million Six Hundred Thirty Thousand Five Hundred Fifteen Sembelin Rupiah).

Item Type: Thesis (Diploma)
Additional Information: RSS 625.7 Set p
Uncontrolled Keywords: Peningkatan jalan; Perkerasan beton semen; Kontrol geometrik; Drainase jalan; Rencana anggaran biaya
Subjects: T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > (D3) Diploma
Depositing User: - Taufiq Rahmanu
Date Deposited: 12 Jul 2019 02:32
Last Modified: 12 Jul 2019 02:32
URI: http://repository.its.ac.id/id/eprint/63923