Lestari, Imas Ayu (2019) Penentuan Waktu Optimum Preventive Maintenance Sistem Spreader dan Tolley pada Container Crane Menggunakan Geometric Process dengan Optimasi Genetic Algorithm di PT Pelabuhan Indonesia III (Persero). Other thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
06211540000031_Undergraduate_Thesis.pdf Download (3MB) | Preview |
Abstract
PT Pelindo III merupakan perusahaan yang bergerak dibidang pelabuhan yang menyediakan jasa bongkar muat barang. Dalam proses bongkar muat barang tersebut digunakan alat berat yaitu container crane yang berfungsi untuk mengangkat barang boks kontainer dari kapal ke daratan. Untuk menjaga kinerja container crane, selama ini perusahaan melakukan pemeliharaan secara preventive. Namun, preventive maintenance yang dilakukan Pelindo III masih belum efektif. Hal ini dapat dilihat dari sering terjadinya kerusakan ketika container crane sedang beroperasi. Oleh karena itu, dalam penelitian ini dibahas mengenai penentuan waktu optimum pemeliharaan preventif pada container crane 01 dan container crane 03 untuk meminimumkan biaya dan meningkatkan usia sistem spreader dan sistem trolley menggunakan metode Geometric Process yang selanjutnya dibandingkan dengan Geometric Process dengan optimasi parameter menggunakan Algoritma Genetika. Metode ini digunakan karena dapat menggambarkan kerusakan container crane memiliki trend. Hasil analisis menunjukkan bahwa waktu optimum masing-masing sistem pada kedua container crane berbeda-beda. Dimana rata-rata biaya jangka panjang yang dihasilkan lebih murah jika dibandingkan dengan biaya yang selama ini dikeluarkan perusahaan.
================================================================================================================================
PT Pelindo III is a port company that provides goods loading and unloading services. In the process of loading and unloading the goods, heavy equipment is used, it called container crane which serve to lift container box items from the ship to the mainland. To maintain the performance of container cranes, the company has carried out preventive maintenance. However, preventive maintenance carried out by Pelindo III is still does not effective yet. It can be seen from the frequent occurrence of failure when a container crane is operating. This study aims to determine the optimum preventive maintenance time to minimize costs and increase the age of the spreader system and trolley system in container cranes 01 and container crane 03 using Geometric Process method which then compared to Geometric Process with parameter optimization using Genetic Algorithms. This method is used because it can describe the trend of failure. The result of the analysis show that the optimum time of each system in the two container cranes is different. Where the average long-term costs produced are cheaper than costs that have been incurred by the company.
Item Type: | Thesis (Other) |
---|---|
Additional Information: | RSSt 519.2 Les p-1 2019 |
Uncontrolled Keywords: | Biaya, Container crane, Geometric Process, Preventive Maintenance |
Subjects: | H Social Sciences > HA Statistics > HA29 Theory and method of social science statistics H Social Sciences > HA Statistics > HA31.7 Estimation Q Science |
Divisions: | Faculty of Mathematics and Science > Statistics > 49201-(S1) Undergraduate Thesis |
Depositing User: | Lestari Imas Ayu |
Date Deposited: | 05 Jun 2023 01:18 |
Last Modified: | 05 Jun 2023 01:18 |
URI: | http://repository.its.ac.id/id/eprint/63962 |
Actions (login required)
View Item |