Perencanaan pemakaian alat berat pada pekerjaan tanah proyek pembangunan jalan Tol Surabaya- Mojokerto seksi IV.3 STA 37+297 s/d STA 42+800

Mubarok, Ahmad (2014) Perencanaan pemakaian alat berat pada pekerjaan tanah proyek pembangunan jalan Tol Surabaya- Mojokerto seksi IV.3 STA 37+297 s/d STA 42+800. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3111105056-Undergraduate_Thesis.pdf

Download (6MB) | Preview

Abstract

Proyek Pembangunan Jalan Tol Surabaya - Mojokerto Seksi IV.3, merupakan salah satu dari proyek Departemen Sipil Umum PT Wijaya Karya (Persero), Tbk. Jalan tersebut merupakan jalan arteri yang menghubungkan Surabaya – Mojokrerto. Salah satu pekerjaan yang perlu diperhatikan dalam proyek jalan adalah pekerjaan tanah yang membutuhkan banyak alat berat, antara lain : Bulldozer, Vibration Roller, Sheepfoot roller, Water truck, dan Dump Truck. Penelitian ini dilakukan untuk merencanakan kebutuhan pemakaian alat berat pada pekerjaan tanah meliputi analisa produktifitas alat berat, berapa jumlah dan tipe alat berat yang akan digunakan, biaya yang dibutuhkan dan penjadwalan pemakaian alat berat. Dalam perhitungan ini menggunakan metode yang mengacu pada perhitungan Pemindahan Tanah Mekanis (PTM) dan Perhitungan Biaya Pelaksanaan Pekerjaan Dengan Menggunakan Alat-Alat Berat. Dari hasil perhitungan yang direncanakan, didapatkan beberapa tipe alat berat yang digunakan dalam proyek ini antara lain adalah : 6 unit Bulldozer tipe D 65E; 5 unit Vibration Roller tipe SV 515D; 4 unit Sheepfoot Roller tipe SV 515TF; 4 unit Water Tank Truck Kap. 5000 L; 5 unit Dump Truck 7 ton; 15 unit Dump Truck 25 ton; dan 7 unit Dump Truck 30 ton. Besarnya biaya sewa penggunaan alat pada proyek tersebut adalah Rp 7.175.008.200,00 dengan total waktu penyelesaian selama 123 hari kalender. ======================================================================================================= One of Civil Department PT. Wijaya Karya (Persero) tbk. is Surabaya – Mojokerto Highway Project. This Higway is arteries road which linked Surabaya and Mojokerto City. One the important things from this project is the (earthwork) which needs a lot of heavy equipment such as : Bulldozer, Vibration Roller, Sheepfoot Roller, Water Truck, and Dump Truck. The purpose of this reseach is to figure the heavy equipment needed on earthwork such as heavy equipment productivity analysis, how many and what type of heavy equipment are going to use, cost and heavy equipment usage schedule. This reseach uses calculation which focused on Pemindahan Tanah Mekanis (PTM) method and Biaya Pelaksanaan Pekerjaan Dengan Menggunakan Alat – Alat Berat. From the draft calculation, it condudes some of heavy equipment which is used on this project such as 6 units Bulldozer type D 65 E; 5 units Vibration Rollers type SV 515 D; 4 units Sheepfoot Rollers type SV 515 TF; 4 units Water Tank Trucks Kap. 5000 L; 5 units Dump Truck 7 ton; 15 units Dump Truck 25 ton; and 7 units Dump Truck 30 ton. The rent cost of all those heavy equipment in that project is amount Rp. 7.175.008.200,00 with total period is 123 days.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 625.702 84 Mub p
Uncontrolled Keywords: Alat berat; biaya; pekerjaan tanah; produktifitas
Subjects: T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > (S1) Undergraduate Theses
Depositing User: - Taufiq Rahmanu
Date Deposited: 15 Jul 2019 02:26
Last Modified: 15 Jul 2019 02:26
URI: http://repository.its.ac.id/id/eprint/63983

Actions (login required)

View Item View Item