Rahmawati, Diah Putri (2019) Rencana Perhitungan Waktu Dan Biaya Pelaksanaan Struktur Apartemen Menara Rungkut Surabaya (Tower B). Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10111815000042-Undergraduate_Theses.pdf Restricted to Repository staff only Download (35MB) | Request a copy |
Abstract
Penyusunan Tugas Akhir terapan yang berjudul Rencana Perhitungan Waktu dan Biaya Pelaksanaan Struktur Apartemen Menara Rungkut Surabaya ini menggunakan Gedung Apartemen Menara Rungkut di Surabaya. Apartemen Menara Rungkut Surabaya memiliki 2 tower, yaitu Tower A dan Tower B. Untuk Tugas Akhir Terapan ini, Tower yang ditinjau adalah Tower B. Apartemen Menara Rungkut Surabaya merupakan Gedung dengan rangka beton yang terdiri dari 15 lantai dengan rangka atap dek beton dan pondasi tiang pancang. Namun yang ditinjau pada tugas akhir ini adalah lantai 1-8. Biaya pelaksanaan dihitung berdasarkan analisa di lapangan melalui survey baik secara langsung maupun melalui peralatan, serta didapatkan dari beberapa literatur. Waktu pelaksanaan dihitung berdasarkan metode pelaksanaan yang digunakan, dan analisa mengenai kapasitas produksi, produktivitas, dan perhitungan durasi pekerjaan. Sehingga dengan metode pelaksanaan yang tepat maka dihasilkan perhitungan waktu dan biaya yang efektif. Untuk penyusunan jadwal tiap item pekerjaan dilakukan dengan bantuan software Microsoftt Project. Hasil akhir pada tugas akhir ini adalah rekapitulasi biaya, metode pelaksanaan yang digunakan, durasi pelaksanaan proyek, serta kuva S. Dari analisa, didapatkan durasi 238 hari kerja biaya pelaksanaan sebesar Rp. 15,237,614,347.40
====================================================================================================================================
This final project is using Apartement Menara Rungkut Surabaya whose has two towers, there are Tower A and Tower B. In this final project, the author using Tower B as the object and data source. Apartment Menara Rungkut Surabaya is a building with concrete frame which consist of 15 floor, but the authors using floor 1-8 for this fonal project.
The calculation cost, counted by analize in the field from direct survey, survey with tools and got from various references.The durations got from the implementatiom methods that used and from the analysis about production capacity, productivity, and calculation duration of each works.
Thus, with the right implementation methods, the calculation of duration and costs would produced effectively. Scheduling of each works using Microsoft Projec. The output of this final project are recapitulation of costs, implementation methods that we used, duratiom, and also S curve.
From the analize, we got 238 day works of duration and implementation cost Rp. 15,237,614,347.40.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Waktu pelaksanaan, biaya pelaksanaan, penjadwalan, kurva S |
| Subjects: | T Technology > T Technology (General) > T56.8 Project Management |
| Divisions: | Faculty of Vocational > 22401-Civil Infrastructure Engineering (D3) |
| Depositing User: | Diah Putri Rahmawati |
| Date Deposited: | 11 Aug 2026 01:34 |
| Last Modified: | 11 Aug 2026 01:34 |
| URI: | http://repository.its.ac.id/id/eprint/65294 |