Perancangan Pile-Raft Foundation Pada Gedung Apartement Cornell Ciputra

Lumintang, Rosy (2019) Perancangan Pile-Raft Foundation Pada Gedung Apartement Cornell Ciputra. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111510000036-Undergraduate_Thesis.pdf] Text
10111510000036-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (16MB) | Request a copy

Abstract

Surabaya merupakan ibu kota provinsi Jawa Timur dengan yang memiliki jumlah penduduk terbanyak di Jawa Timur, tercatat pada tahun 2015 sebanyak 2.848.583 jiwa yang berdomisili di kota Surabaya (Statistika, 2018). Untuk memenuhi kebutuhan hunian pendudukanya hunian vertikal merupakan solusi yang baik dengan mempertimbagkan ketersediaan lahan yang ada. Corrnell apartement merupakan salah satu gedung tinggi yang direncanakan akan dibangun di Surabaya Barat yang memiliki satu basement dengan kedalaman -4 m , Lantai Dasar , Lantai 2 hingga lantai 6 sebagai soho, kemudian Lantai 7 hingga 32 sebagai apartement, dan lantai atap dengan ketinggian puncak +99,00 m. Cornell apartement terletak di Surabaya dimana secara geologi kondisi tanah di Surabaya sebagian besar berupa tanah lunak. Dengan pertimbangan tersebut, pondasi yang dirasa cocok untuk diterapkan pada gedung tinggi dan jenis tanah seperti tanah di Surabaya adalah pondasi raft. Pondasi raft nantinya akan mengatasi masalah penurunan yang akan terjadi. Bukan tidak terjadi penurunan. Namun, penurunan yang terjadi akan sama di semua bagian gedung. Pondasi raft sering dipadukan dengan pondasi tiang pancang yang disebut pile raft foundation yang bertujuan agar pondasi memiliki kapasitas menahan beban lebih besar dan meminimalisir penurunan yang terjadi. Pile raft foundation dirancang sesuai dengan SNI 8460-2017 tentang persyaratan perancangan geoteknik dan pada proses permodelan pile raft foundation yang meliputi permodelan bore pile menggunakan bantuan software geo5 untuk mengetahui kapasitas daya dukung satu tiang dan permodelan pile-raft foundation dengan bantuan software plaxis 2D untuk mengetahui penurunan yang terjadi. Selain itu perancangan metode pelaksanan juga dirancang agar pelaksanaan pembangunan pondasi raft dapat dilakukan dengan aman untuk mengantisipasi terjadinya kelongsoraan. Nantinya dinding penahan tanah akan dibuat dengan tipe soldier pile dan dilakukan cek kestabilan dengan menggunakan progam bantu geo5. Berdasarkan hasil permodelan pada geo 5 didapatkan dimensi bore pile diameter 1 m dan kedalam 45 m dengan jarak 3 m yang memiliki kapasitas daya dukung sebesar 54736.28 kN. Hasil permodelan plaxis 2D ver 2015 didapatkan tebal raft foundation sebesar 2 m degan dimensi 42 x 28 m dan terjadi penurunan sebesar 13 cm, dimana dalam SNI 8460-2017 tentang persyaratan perancangan geoteknik standar penurunan yang terjadi adalah sebesar 15 cm. Metode pelaksanaan dari pembangunan pile raft foundation ada beberapa tahap yaitu : 1.tahap persiapan, 2. Tahap pembersihan lahan, 3. Tahap Pemancangan bore pile dan dinding penahan (soldier pile), 4. Tahap Penggalian Tanah, 5. Pemotongan tiang Bore Pile (cutting pile), 6. Pembesian raft foundation, 7. Pengecoran raft foundation, 8. Pekerjaan Basement, 9. Pekerjaan Struktur Atas. 10. Selesai. Untuk Menjaga kestabilan galian maka dimodelkan diding penahan tanah dan didapatkan dimensi soldier pile sebesar 0.6 m dengan jarak 0.9 m dan kedalam 18 m.
===========================================================================================================================
Surabaya is the capital of East Java province with the largest population in East Java, recorded in 2015 as many as 2,848,583 people who lived in the city of Surabaya (Statistics, 2018). To meet the occupancy needs of occupation vertical occupancy is a good solution by considering the available land. Correll Apartment is one of the tall buildings planned to be built in West Surabaya which has one basement with a depth of -4 m, Ground Floor, Floor 2 to 6 floor as Soho, then Floors 7 to 32 as apartments, and roof floors with peak height + 99.00 m. Cornell apartment is located in Surabaya where the geological conditions in Surabaya are mostly soft soil. With these considerations, the foundations that are suitable to be applied to tall buildings and the type of soil such as land in Surabaya are raft foundations. The foundation of the raft will overcome the problem of decline that will occur. Not no decline. However, the decline will be the same in all parts of the building. Raft foundation is often combined with a pile foundation called a pile raft foundation which aims to have the capacity to withstand greater loads and minimize the decline that occurs. Pile raft foundation was designed following SNI 8460-2017 regarding the requirements for geotechnical design and in the process of modeling pile raft foundation which includes bore pile modeling using geo5 software to determine the bearing capacity of one pole and pile-raft foundation modeling with the help of 2D plaxis software to find out the decline that occurred. In addition, the design of the implementation method is also designed so that the construction of raft foundations can be carried out safely to anticipate the occurrence of landslides. Later the retaining wall will be made with a soldier pile type and stability checks will be carried out using the geo5 auxiliary program. Based on the modeling results on geo 5, the dimensions of bore pile 1 m and into 45 m with a distance of 3 m have a carrying capacity of 54736.28 kN. The results of 2D plaque modeling ver 2015 found raft foundation thickness of 2 m with dimensions of 42 x 28 m and a decrease of 13 cm, where in SNI 8460-2017 the requirements for standard geotechnical design of the decline that occurred were 15 cm. There are several stages of the implementation of the construction of the pile raft foundation, namely: 1. Preparation stage, 2. Land clearing phase, 3. Stage of bore pile erection and soldier pile, 4. Ground excavation stage, 5. Cutting Bore Pile pole ( cutting pile), 6. Reinforcement of raft foundation, 7. Casting raft foundation, 8. Basement work, 9. Upper Structural Work. 10. Finish. To maintain the stability of the excavation, a soil retaining wall is modeled and the dimensions of the soldier pile are 0.6 m with a distance of 0.9 m and 18 m.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pondasi, pile raft foundation, Soldier Pile, Geo5, Plaxis 2D
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA775 Foundations.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: Rosy Lumintang
Date Deposited: 06 Aug 2026 08:47
Last Modified: 06 Aug 2026 08:47
URI: http://repository.its.ac.id/id/eprint/65322